FIR07-00497
| INSP-Sprinkler Rough-in/Hydro | 6/29/2007 | 6/29/2007 | 6/29/2007 3:48:55 PM | P | PASS |
|
|
See the city approved plans for the locations where the sprinkler piping can be covered. I also spoke with the building contractor about the fire blocking and sprinkler issues in the furred out walls.
|
BLD06-01095
| FIRE-Final Inspection | 6/28/2007 | 6/29/2007 | 6/29/2007 1:21:02 PM | A | PASS |
|
|
Life safety passed
|
BLD07-00025
| FIRE-Final Inspection | 6/28/2007 | 6/29/2007 | 6/29/2007 1:17:29 PM | A | PASS |
|
|
life safety passed
|
FIR07-00527
| INSP-Sprinkler Rough-in | 6/28/2007 | 6/29/2007 | 6/29/2007 9:52:41 AM | A | PASS |
|
|
Underground piping is ok to cover
|
FIR07-00429
| INSP-Final Inspection | 6/28/2007 | 6/29/2007 | 6/29/2007 9:24:31 AM | A | FAIL |
|
|
Upright heads are blocked by structural members, wrog heads have been installed and with the additional 90s added to the brachlines the minumum 5% cushion is not achieved. Larger piping is going to have to be installed.
|