BLD06-00694
| BLD-Final | 6/27/2007 | 6/29/2007 | 6/29/2007 4:49:00 PM | P | PASS |
|
|
Jay owner to be present for inspection. Call within 30-45 mins. Phone #: ###-#### Internet Inspection Request from: Timothy Gammill
|
BLD06-00694
| DOC - Permit Finaled | 6/29/2007 | 6/29/2007 | 6/29/2007 4:48:50 PM | P | PASS |
|
|
|
BLD07-00387
| BLD-Framing/Rough-in | 6/29/2007 | 6/29/2007 | 6/29/2007 3:36:17 PM | P | NR |
|
|
Phone #: ###-#### Internet Inspection Request from: Steven Stover. No truss engineering.
|
BLD07-01438
| BLD-Foundation | 6/29/2007 | 6/29/2007 | 6/29/2007 3:16:03 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/29/2007 at 9:02:06 AM. Contact: ###-####.
|
BLD07-01189
| BLD-Energy code compliance | 6/29/2007 | 6/29/2007 | 6/29/2007 2:59:18 PM | P | PASS |
|
|
russ Phone #: ###-####. Air seal package ok.
|
BLD06-01621
| BLD-Energy code compliance | 6/29/2007 | 6/29/2007 | 6/29/2007 2:40:53 PM | P | PASS |
|
|
duane Phone #: 579-410. 2hr elevator shaft enclosure, 1st and 2nd floor. Energy for bldg envelope is ok and now completed.
|
BLD07-01545
| BLD-Framing/Rough-in | 6/29/2007 | 6/29/2007 | 6/29/2007 2:10:50 PM | P | PASS |
|
|
becky; Phone #: ###-#### Internet Inspection Request from: Victoria Apata. Framing for detached shop only.- ok (Will require landing on exterior side of door.
|
BLD07-01190
| BLD-Framing/Rough-in | 6/28/2007 | 6/29/2007 | 6/29/2007 1:54:41 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 6/28/2007 at 7:45:31 AM. Contact: ###-####. Finish nailing off simpson hangars upstairs. Provide approved repair for floor joist were cut at end. Provide mech. connection on 2 ply at garage. c/n posted. ok to insul.
|
BLD07-01139
| BLD-Final | 6/28/2007 | 6/29/2007 | 6/29/2007 11:59:38 AM | A | NR |
|
|
brad Phone #: ###-####. Needs fire.
|
BLD07-01626
| BLD-Final | 6/27/2007 | 6/29/2007 | 6/29/2007 11:46:34 AM | A | NR |
|
|
nate Phone #: ###-####. Needs zoning.
|
BLD07-01627
| BLD-Final | 6/27/2007 | 6/29/2007 | 6/29/2007 11:46:03 AM | A | NR |
|
|
nate Phone #: ###-####. Needs zoning.
|
BLD07-01119
| BLD-Footing | 6/28/2007 | 6/29/2007 | 6/29/2007 11:30:40 AM | A | FAIL |
|
|
matt Phone #: ###-####. Work is not far enough along to pass. Needs to clean out bottom of footing (vegetation, tree roots.) remove excess dirt away from existing foundation so tie in can be made. Will also have to remove vegetation from interior slab area before fill material can be placed. Due to amount of fill material needed, compaction testing will be performed. Contractor to recall footing insp.
|
BLD07-00164
| BLD-Final | 6/27/2007 | 6/29/2007 | 6/29/2007 11:03:37 AM | A | PASS |
|
|
zack Phone #: ###-####. ok for perm occ.
|
BLD07-00665
| BLD-Final | 6/28/2007 | 6/29/2007 | 6/29/2007 10:44:26 AM | A | PASS |
|
|
ok for perm occ.
|
BLD07-00948
| BLD-Conference | 6/28/2007 | 6/29/2007 | 6/29/2007 10:12:51 AM | A | DONE |
|
|
craig Phone #: ###-####
|
BLD07-01459
| BLD-Footing | 6/29/2007 | 6/29/2007 | 6/29/2007 9:37:34 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 6/29/2007 at 5:44:42 AM. Contact: ###-####. wip.
|
BLD06-00926
| BLD-Final | 6/28/2007 | 6/29/2007 | 6/29/2007 9:23:36 AM | A | PASS |
|
|
ok for temp occ. Will be ok for perm occ once others perm.
|
BLD06-00925
| BLD-Final | 6/28/2007 | 6/29/2007 | 6/29/2007 9:22:51 AM | A | PASS |
|
|
ok for temp. occ. Will be ok for perm occ once others perm.
|
BLD06-00924
| BLD-Final | 6/28/2007 | 6/29/2007 | 6/29/2007 9:22:10 AM | A | PASS |
|
|
ok for temp occ. Will be ok for perm occ once others perm.
|
BLD06-00923
| BLD-Final | 6/28/2007 | 6/29/2007 | 6/29/2007 9:21:12 AM | A | PASS |
|
|
temp occ. given. Will be ok for perm occ once others go perm.
|
BLD07-00665
| Extend Permit 180 days | 6/28/2007 | 6/29/2007 | 6/28/2007 1:05:44 PM | A | CANC |
|
|
|
BLD07-00665
| BLD-Final | 6/27/2007 | 6/29/2007 | 6/28/2007 8:24:33 AM | A | CANC |
|
|
mor Phone #: ###-####
|