ESC10-00481
| Site Preparation | 6/29/2010 | 6/29/2010 | 7/1/2010 2:16:09 PM | | FAIL |
|
|
need clean out cleaned out.
|
BLD09-00872
| BLD-Aging Inspection | 6/29/2010 | 6/29/2010 | 6/30/2010 4:07:30 PM | | PART |
|
|
|
BLD08-01886
| BLD-Aging Inspection | 6/29/2010 | 6/29/2010 | 6/30/2010 2:14:29 PM | | PASS |
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD08-01883
| BLD-Aging Inspection | 6/29/2010 | 6/29/2010 | 6/30/2010 2:10:30 PM | | PASS |
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD08-02081
| BLD-Aging Inspection | 6/29/2010 | 6/29/2010 | 6/30/2010 2:09:40 PM | | PASS |
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD10-01446
| BLD-Final | 6/29/2010 | 6/29/2010 | 6/29/2010 4:08:18 PM | P | PASS |
|
|
|
BLD10-01446
| DOC - Permit Finaled | 6/29/2010 | 6/29/2010 | 6/29/2010 4:08:04 PM | P | PASS |
|
|
|
BLD10-01446
| BLD-Conference | 6/29/2010 | 6/29/2010 | 6/29/2010 4:07:48 PM | P | PASS |
|
|
Replaced 9 Windows & 1 Door. The bedroom windows were replaced with Casement windows and NOW MEET EGRESS. There were no structural changes made. Inspection requested from web by: Pam Page, Office Manager Phone #: ###-####
|
BLD09-00885
| BLD-Aging Inspection | 6/29/2010 | 6/29/2010 | 6/29/2010 2:27:09 PM | | PASS |
|
|
ele expired // R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD09-00885
| DOC - Permit Expired | 6/29/2010 | 6/29/2010 | 6/29/2010 2:26:35 PM | P | PASS |
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD08-01803
| DOC - Permit Expired | 6/28/2010 | 6/29/2010 | 6/29/2010 2:20:55 PM | P | PASS |
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD08-01751
| DOC - Permit Expired | 6/28/2010 | 6/29/2010 | 6/29/2010 2:20:16 PM | P | PASS |
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD10-00880
| BLD-Foundation | 6/29/2010 | 6/29/2010 | 6/29/2010 2:19:10 PM | P | PASS |
|
|
harvey Phone #: ###-####
|
ESC10-00336
| Random Inspection | 6/29/2010 | 6/29/2010 | 6/29/2010 2:18:49 PM | P | PASS |
|
|
|
BLD10-00999
| BLD-Final | 6/28/2010 | 6/29/2010 | 6/29/2010 1:23:49 PM | P | PASS |
|
|
brian Phone #: ###-####
|
BLD10-01091
| BLD-Final | 6/29/2010 | 6/29/2010 | 6/29/2010 1:23:04 PM | P | PASS |
|
|
jim Phone #: ###-####
|
BLD10-01091
| DOC - Permit Finaled | 6/29/2010 | 6/29/2010 | 6/29/2010 1:22:53 PM | P | PASS |
|
|
|
BLD10-00287
| BLD-Final | 6/28/2010 | 6/29/2010 | 6/29/2010 11:11:42 AM | A | PASS |
|
|
Mike Phone #: ###-#### l/c at front desk.
|
BLD10-00287
| DOC - Permit Finaled | 6/29/2010 | 6/29/2010 | 6/29/2010 11:11:19 AM | P | PASS |
|
|
|
ESC09-00712
| Site Final | 6/29/2010 | 6/29/2010 | 6/29/2010 10:23:43 AM | A | PASS |
|
|
|
BLD09-01992
| BLD-Final | 6/28/2010 | 6/29/2010 | 6/29/2010 10:23:26 AM | A | PASS |
|
|
dave Phone #: ###-####
|
ESC10-00361
| Random Inspection | 6/28/2010 | 6/29/2010 | 6/29/2010 9:56:24 AM | A | PASS |
|
|
|
BLD10-00934
| BLD-Footing | 6/28/2010 | 6/29/2010 | 6/29/2010 9:56:06 AM | A | PASS |
|
|
sabstian Phone #: ###-####
|
BLD09-00511
| BLD-Conference | 6/28/2010 | 6/29/2010 | 6/29/2010 9:32:37 AM | A | PASS |
|
|
andy is checking w/owner
|
BLD09-00509
| BLD-Conference | 6/28/2010 | 6/29/2010 | 6/29/2010 9:31:31 AM | A | PASS |
|
|
andy is checking w/owner
|