Inspections for the day of: Wednesday, June 29, 2011.
Number of inspections: 10
Percentage of inspections complete: 90 %
Percentage of inspections not complete: 10 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00025 INSP-Final Inspection6/22/20116/22/2011 P 
Troy phone #: ###-####
FIR11-00095 INSP-Sprinkler Rough-in6/28/20116/29/20116/29/2011 4:51:31 PMPNR
Partial walkthrough of the 1st floor office area only- noted field modifications at some areas in branchline routing, head location/type, relocated aux drain, etc., noted one missing head at a closet, missing hanger, heads, armovers and drops are not yet installed at some areas. Discussed elevator hoistway and SW head at the exterior canopy. Field mods will require as-built or plan modification depending on calcs.
BLD11-01241 FIRE-Final Inspection6/29/20116/29/20116/29/2011 4:44:21 PMPPASS
C/N items verified for completion. Life safety inspection passed.
FIR11-00293 INSP-Sprinkler Rough-in6/29/20116/29/20116/29/2011 4:43:37 PMPPART
OH work okay to cover, noted correction item finished.
BLD11-01389 FIRE-Final Inspection6/29/20116/29/20116/29/2011 4:42:00 PMPPASS
Corrections verified, life safety passed.
FIR11-00240 INSP-Sprinkler Rough-in6/28/20116/29/20116/29/2011 4:41:01 PMAPART
Overhead work approved for cover.
BLD11-00101 FIRE-Conference6/28/20116/29/20116/29/2011 4:40:26 PMADONE
Regarding area of refuge notations per plan submital.
FIR11-00170 INSP-Final Inspection6/28/20116/29/20116/29/2011 4:38:33 PMAPASS
Fire sprinkler permit work passed final walkthrough.
FIR08-00239 INSP-Sprinkler Rough-in6/28/20116/29/20116/29/2011 4:37:44 PMAPART
See plans for areas on 1st thru 4th floors building #3 inspected today for cover approval. Noted locations in need of adjustment.
FIR11-00306 INSP-Final Inspection6/28/20116/29/20116/29/2011 4:33:18 PMAPASS
Hood suppression system operated correctly under test conditions. Inspection passed.