ESC09-00198
| General Inspection | 6/29/2011 | 6/29/2011 | 6/29/2011 2:54:54 PM | P | PASS |
|
|
Sign posted, no tracking and site currently is inactive.
|
ESC11-00444
| Site Preparation | 6/29/2011 | 6/29/2011 | 6/29/2011 1:33:52 PM | P | PASS |
|
|
Sign is posted, no problems observed.
|
ESC10-00657
| General Inspection | 6/29/2011 | 6/29/2011 | 6/29/2011 11:12:25 AM | A | PASS |
|
|
Hard surfaces clean, area not active with construction. Hillsides have been resprayed but north side hillsides as of yet doesn not have growth.
|
ESC09-00352
| Conference | 6/29/2011 | 6/29/2011 | 6/29/2011 10:41:18 AM | A | DONE |
|
|
9:00 a.m. Work on Wellings and the area between the Penn and Welling below the lower Ped. Bridge will not take place until water levels have stabilized with normal flows and ground water is not an issue which will reduce turbid discharges.
|