FIR15-00441
| INSP-Final Inspection | 6/25/2015 | 6/29/2015 | 6/29/2015 2:45:51 PM | P | FAIL |
|
|
Inspection stopped after possible issue with the AES. Alarmco is going to investigate. Need sheilded wire between the FACP and the AES grounded.
|
FIR14-00464
| INSP-Final Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 2:42:46 PM | P | FAIL |
|
|
Need signage on risers, need time on flow switches changed, need to verify bell functions. I need to walk through and verify heads.
|
FIR15-00078
| INSP-Final Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 2:37:48 PM | P | PART |
|
|
Permit will be ok to final when the existing/demo'd sprinkler piping has been removed. Trip time is under 60 seconds
|
FIR14-00354
| INSP-Final Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 2:36:04 PM | P | PASS |
|
|
permit finaled
|
BLD15-00383
| FIRE-Final Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 1:06:12 PM | P | PASS |
|
|
Life safety passed. Contractor to provide occupant load sign prior to a building sign off.
|