Inspections for the day of: Monday, June 29, 2015.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS15-00154 BLD-Conference6/29/20156/29/20156/30/2015 1:42:42 PMPCANC
BLD13-03411 BLD-Final6/26/20156/29/20156/29/2015 3:14:27 PMPNR
James Phone #: ###-####. Needs blower door test, door from garage to dwelling to be self closing. Also noted rigid foam insulation on perimeter stemwalls that may require a thermal barrier, contractor to get data.
ESC13-01265 Site Final6/29/20156/29/20156/29/2015 3:12:29 PMPDONE
ESC13-01265 DOC - Permit Finaled6/29/20156/29/20156/29/2015 3:12:16 PMPPASS
BLD15-01324 BLD-Framing/Rough-in6/29/20156/29/20156/29/2015 2:50:30 PMPPASS
Terry Phone #: ###-####
BLD15-01530 BLD-Footing6/26/20156/29/20156/29/2015 1:50:35 PMPNR
Jerry Phone #: ###-####. No one on site, no form work erected, no plans.
ESC15-00203 Site Final6/29/20156/29/20156/29/2015 1:49:48 PMPDONE
ESC15-00203 DOC - Permit Finaled6/29/20156/29/20156/29/2015 1:49:37 PMPPASS
BLD15-00590 BLD-Final6/29/20156/29/20156/29/2015 1:49:15 PMPPASS
Brett Phone #: ###-####
BLD15-00590 DOC - Permit Finaled6/29/20156/29/20156/29/2015 1:48:57 PMPPASS
BLD15-01246 BLD-Framing/Rough-in6/26/20156/29/20156/29/2015 1:48:37 PMPPART
Dan Phone #: ###-####. Provide additional 2x4 studs at top plate split in garge next to electrical panel, Provide truss engineering, ok to insulate pending mech. rough in inspection.
BLD15-01856 BLD-Framing/Rough-in6/26/20156/29/20156/29/2015 11:19:14 AMAPART
Doug Phone #: ###-####. New soffitt framing ok. Pending fire sprinkler rough in.
BLD15-00498 BLD-Footing6/28/20156/29/20156/29/2015 10:28:33 AMANR
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. No city approved plans on site.
BLD15-00289 BLD-Energy code compliance6/26/20156/29/20156/29/2015 9:49:19 AMANR
Not a Building Final but we are looking at obtaining temporary certification of occupancy for suite 130. All work is completed in this suite and we are needing to move the training center into this new space before we can start demoing the existing space they occupy. Phone #: ###-#### Inspection requested via web by Jason Jones
BLD15-01863 BLD-Conference6/25/20156/29/20156/29/2015 8:56:36 AMADONE
Inspection requested via web by Scott Smith. All work appeared to be done in accordance with local codes and ordinances.
BLD15-01863 DOC - Permit Finaled6/29/20156/29/20156/29/2015 8:55:43 AMPPASS