ESC13-00259
| Aging Inspection | 6/29/2015 | 6/29/2015 | 6/30/2015 11:23:24 AM | | PEND |
|
|
All BMPs removed and hillside stabilized & vegetated. Townhome construction is complete.
1 remaining correction:
Remove DI bags on MS4 storm drains on main section of Millet.
Will advise Tahoe Homes and Conger Development.
|
ESC15-00686
| Site Preparation | 6/29/2015 | 6/29/2015 | 6/29/2015 4:35:39 PM | P | CANC |
|
|
requested by Bruce ###-####
schedule for tomorrow
|
ESC14-00759
| General Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 4:32:49 PM | | PASS |
|
|
|
ESC15-00177
| BMP Violation | 6/29/2015 | 6/29/2015 | 6/29/2015 4:30:18 PM | P | FAIL |
|
|
Illicit concrete washout in gutter with some flow into DI.
Need to clean immediately. RP notified of violation.
|
ESC14-00614
| General Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 4:22:01 PM | | PASS |
|
|
|
ESC14-00696
| General Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 1:39:22 PM | | PASS |
|
|
WIP. Stubbing into sewer on Reserve at the moment. Stockpile stored safely. No trackout, discharges, or sediment runoff. No fugitive dust or uncontained trash/materials. Site is enclosed with chain link security fence. No violations observed.
|
ESC14-00653
| Aging Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 12:16:21 PM | | PASS |
|
|
No activity at home renovation and basement addition. No loose dirt or disturbed area at site. Last activity on BLD was in April. No corrections needed.
|
ESC14-00169
| Aging Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 12:00:02 PM | | PASS |
|
|
Project near complete, some construction activity observed. No corrections need, no issues at site, all sediment and materials remaining on Idaho Power site.
|
ESC14-01097
| General Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 11:46:49 AM | | PASS |
|
|
WIP. No trackout from site. Minimal activity occuring, build frame & shell are up. No corrections.
|
ESC15-00499
| Site Preparation | 6/26/2015 | 6/29/2015 | 6/29/2015 10:58:19 AM | A | PASS |
|
|
Del Taco - site prep make up inspection/conference
WIP. Corrections made. Permit sign is now posted on perimeter fence. Met superintendant James ###-#### on site to discuss plans. Concrete work tomorrow will use plastic tub for leakproof washout.
Issued request that stockpile may require dust control or reconfiguration/removal if issues arise and also to notify employees to be mindful of dust when entering or leaving site.
|
ESC15-00200
| Random Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 10:41:39 AM | P | PASS |
|
|
Old building (Radean's) has been demolished. Project is now in new vertical phase and walls and monument signs covered under ESC15-00768.
No trackout or discharges, no fugitive dust or other issues observed.
|
ESC13-01159
| General Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 10:31:29 AM | | PART |
|
|
Peppermill subdivision phase development is complete, permit open to monitor SFH construction by CBH, each with individual ESC permits as well.
Streets, gutters and storm drain structures are free of significant sediment. No materials spills or discharges observed.
Two corrective actions needed: 1. Pick up the wind blown trash that has deposited on the undeveloped SE corner of site at end of Sumpter. 2. Need new concrete washout pit for any new foundations to start this week.
Corrections issued to CBH RP and also notified developer.
|
ESC15-00777
| Site Preparation | 6/26/2015 | 6/29/2015 | 6/29/2015 9:50:31 AM | A | PASS |
|
|
Call 15 min to meet there // Raider Phone #: ###-####
Permit sign posted clearly. Work to occur in backyard which is below level of street and alley, so sheet flow is to the center of the yard, which will remain vegetated/undisturbed.
Main BMP will be housekeeping and sweep up of any incidental trackout. Approved.
|
ESC13-00471
| Aging Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 8:59:02 AM | | PASS |
|
|
|