BLD16-01719
| FIRE-Conference | 6/29/2016 | 6/29/2016 | 6/29/2016 3:07:23 PM | P | DONE |
|
|
For a final sign off I need Fire Dept approval of their inspection, mount the fire extinguisher and finish installing the bollards. Today I verifed the depth of the new bollards and tested the emergency off button.
|
FIR16-00239
| INSP-Sprinkler Rough-in | 6/29/2016 | 6/29/2016 | 6/29/2016 2:37:12 PM | P | PASS |
|
|
See the city approved plans for heads marked "ok" where tile is ok to install
|
BLD16-02260
| FIRE-Final Inspection | 6/29/2016 | 6/29/2016 | 6/29/2016 1:53:48 PM | P | FAIL |
|
|
See the city approved plans for list of required corrections that include: sprinkler permit for required modifications, repair all exit signs/emergency lights, provide sticker at main exit, remove deadbolts from office and rear exit doors, resubmit plans with corrected wall layout (plans show island restrooms shared with another tenant but door no longer exists.
|
BLD16-02131
| FIRE-Final Inspection | 6/22/2016 | 6/29/2016 | 6/29/2016 10:10:12 AM | A | PASS |
|
|
life safety passed
|
BLD16-01545
| FIRE-Final Inspection | 6/28/2016 | 6/29/2016 | 6/29/2016 10:08:51 AM | A | PASS |
|
|
Life safety passed. Lever hardware to be installed on the two connecting doors as discussed and as per plans prior to a building inspection.
|
FIR15-00822
| INSP-Conference | 6/29/2016 | 6/29/2016 | 6/29/2016 8:36:16 AM | A | DONE |
|
|
57psi on the guage at 7:00 am this morning
|
BLD15-01869
| FIRE-Conference | 6/29/2016 | 6/29/2016 | 6/29/2016 8:35:45 AM | A | DONE |
|
|
57psi on the guage at 7:00 am this morning
|