Inspections for the day of: Wednesday, June 29, 2016.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-02284 BLD-Conference6/29/20166/29/20166/29/2016 3:59:03 PMPFAIL
Occupancy Permit is going to expire soon. Just need to make sure the space is not being occupied before letting permit expire if needed. A coorection notice was issued noting to call and schedule life/safety and structural final inspections.
BLD16-01483 BLD-Final6/23/20166/29/20166/29/2016 3:58:13 PMPNR
David Phone #: ###-####
BLD16-01486 BLD-Final6/23/20166/29/20166/29/2016 3:57:57 PMPNR
David Phone #: ###-####
BLD16-01482 BLD-Final6/23/20166/29/20166/29/2016 3:57:39 PMPNR
David Phone #: ###-####
BLD16-01797 BLD-Framing/Rough-in6/28/20166/29/20166/29/2016 3:46:12 PMAPART
Paul Phone #: ###-####. Interior steel stud framed wall ok. A correction notice was issued to correct building construction type and for the 1hr. rated corridors.
BLD16-01702 BLD-Final6/27/20166/29/20166/29/2016 2:00:23 PMPPASS
Binh Thanh// please call before- this inspection os for occupancy Phone #: ###-####. Ok for perm occ.
MIS16-00195 BLD-Conference6/29/20166/29/20166/29/2016 1:53:30 PMAPASS
Call Rhiannon ###-#### making sure all things meet code. if nothing wrong then good to go.
MIS16-00195 DOC - Permit Finaled6/29/20166/29/20166/29/2016 1:53:22 PMPPASS
BLD16-02131 BLD-Final6/29/20166/29/20166/29/2016 1:37:20 PMPPASS
Call to meet there // Christy Phone #: ###-####. Ok for perm occ.
BLD16-01608 BLD-Wall Bracing6/29/20166/29/20166/29/2016 10:09:44 AMAPASS
Second story walls. Phone #: ###-#### Inspection requested via web by Paul Thompson