BLD17-00090
| BLD-Foundation | 6/26/2017 | 6/29/2017 | 7/12/2017 5:54:46 AM | A | DONE |
|
|
Inspection of LL3 foundation reinforcement complete - 1,900cy concrete placement scheduled for 0100hr start on 7/1 Phone #: ###-#### Inspection requested via web by Jamal Nelson
|
BLD16-03993
| BLD-Aging Inspection | 6/29/2017 | 6/29/2017 | 7/6/2017 3:42:11 PM | | PASS |
|
|
|
BLD17-01901
| BLD-Framing/Rough-in | 6/29/2017 | 6/29/2017 | 6/29/2017 4:44:54 PM | P | PASS |
|
|
Jason Phone #: ###-####
|
BLD15-01122
| BLD-Framing/Rough-in | 6/28/2017 | 6/29/2017 | 6/29/2017 4:44:17 PM | P | PASS |
|
|
2nd floor // Ed Phone #: ###-#### ok to insulate
|
BLD15-01118
| BLD-Energy code compliance | 6/28/2017 | 6/29/2017 | 6/29/2017 4:43:34 PM | P | PART |
|
|
Ed Phone #: ###-#### second floor ok to cover
|
BLD16-04536
| BLD-Conference | 6/29/2017 | 6/29/2017 | 6/29/2017 4:42:53 PM | P | DONE |
|
|
Pre walk final if schedule allows. Call Adam when available. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD16-01625
| BLD-Framing/Rough-in | 6/28/2017 | 6/29/2017 | 6/29/2017 1:59:58 PM | A | PASS |
|
|
After 3, please - Glen Phone #: ###-####
|
BLD16-00172
| BLD-Final | 6/28/2017 | 6/29/2017 | 6/29/2017 1:54:54 PM | P | PASS |
|
|
Please call ahead for access - Scott Phone #: ###-####
|
BLD17-00216
| BLD-Final | 6/29/2017 | 6/29/2017 | 6/29/2017 1:24:48 PM | P | NR |
|
|
Zack Phone #: ###-####
|
BLD16-01746
| BLD-Final | 6/28/2017 | 6/29/2017 | 6/29/2017 1:24:13 PM | P | FAIL |
|
|
Inspection requested via web by Steve Chandler needs to meet the 2012 irc appendix G codes for barrier requiements around the pool
|
BLD17-00704
| BLD-Final | 6/28/2017 | 6/29/2017 | 6/29/2017 12:14:28 PM | A | FAIL |
|
|
call 20 min ahead // Elena Berti Phone #: ###-#### needs mec final and hard wire smoke and co2 detectors up stairs
|
BLD16-01542
| BLD-Foundation | 6/29/2017 | 6/29/2017 | 6/29/2017 11:59:14 AM | P | PASS |
|
|
Pouring at 1 - Advardo Phone #: ###-####
|
BLD17-01900
| BLD-Footing | 6/28/2017 | 6/29/2017 | 6/29/2017 11:00:11 AM | A | PASS |
|
|
Early as possible - Eric Phone #: ###-####
|
BLD16-04350
| BLD-Framing/Rough-in | 6/28/2017 | 6/29/2017 | 6/29/2017 10:59:54 AM | A | PASS |
|
|
I am looking for a Framing Inspection to start sheetrock on the second phase of this project. The door is located on the south side of the build and the lock box is attached to the bike rack across from the door. The lock box code is 1027. I would like to meet you onsite if possible to review/address any issues or concerns. Thank you for your time.
-Drew Moorhouse McCarter-Moorhouse Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD17-01545
| BLD-Framing/Rough-in | 6/28/2017 | 6/29/2017 | 6/29/2017 8:24:08 AM | A | PASS |
|
|
Call prior to going Phone #: 2088415809 >> Inspection requested via mobile web by Mike
|
BLD17-01673
| BLD-Final | 6/28/2017 | 6/29/2017 | 6/29/2017 8:06:31 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Christian Kilpatrick
|
BLD17-01673
| DOC - Permit Finaled | 6/29/2017 | 6/29/2017 | 6/29/2017 8:06:21 AM | P | PASS |
|
|
|