BLD17-02479
| BLD-Final | 6/28/2018 | 6/29/2018 | 6/29/2018 4:22:23 PM | P | PASS |
|
|
Pat Phone #: ###-#### OK for Temp Occ. OK for Perm occ. when Zoning perms
|
BLD17-01904
| BLD-Final | 6/28/2018 | 6/29/2018 | 6/29/2018 3:57:26 PM | P | PASS |
|
|
Margo Phone #: ###-####
|
BLD17-01904
| DOC - Permit Finaled | 6/29/2018 | 6/29/2018 | 6/29/2018 3:57:13 PM | P | PASS |
|
|
|
BLD17-01054
| BLD-Final | 6/29/2018 | 6/29/2018 | 6/29/2018 3:33:05 PM | P | PASS |
|
|
|
BLD17-02478
| BLD-Framing/Rough-in | 6/28/2018 | 6/29/2018 | 6/29/2018 3:26:52 PM | P | NR |
|
|
Pat-ste #''s 107, 108, 207, 208, 307, 308 Phone #: ###-#### Major Firecaulking issues at fir downs, rated stairway walls, and draftstops.......... Penitrations and edges.
|
BLD17-02478
| BLD-Framing/Rough-in | 6/28/2018 | 6/29/2018 | 6/29/2018 3:19:07 PM | P | CANC |
|
|
Pat Phone #: ###-####
|
BLD18-02071
| BLD-Framing/Rough-in | 6/28/2018 | 6/29/2018 | 6/29/2018 2:22:27 PM | P | PASS |
|
|
Crystal Phone #: ###-#### Electrical and new Gas Line pressure test OK. Range hood duct was listed on Mech permit........No duct installed......they said they were going to rock over hole?
|
BLD18-02084
| BLD-Wall cover | 6/28/2018 | 6/29/2018 | 6/29/2018 2:04:17 PM | P | PASS |
|
|
Eric Phone #: ###-#### Frame and Energy.....OK.
|
BLD18-01856
| BLD-Foundation | 6/28/2018 | 6/29/2018 | 6/29/2018 12:19:17 PM | A | PASS |
|
|
As late in the morning as possible please Phone #: ###-#### Inspection requested via web by Christian Mikesell
|
BLD18-01773
| BLD-Footing | 6/28/2018 | 6/29/2018 | 6/29/2018 12:13:00 PM | A | PASS |
|
|
Jared Phone #: ###-####
|
BLD17-04224
| BLD-Final | 6/29/2018 | 6/29/2018 | 6/29/2018 11:29:11 AM | P | CANC |
|
|
Front door is open, please call with any questions. Thank you - Joe Phone #: ###-#### >> Inspection requested via web by Todd Campbell Inspection cancelled from web by: Todd Campbell
|
BLD17-03525
| BLD-Conference | 6/28/2018 | 6/29/2018 | 6/29/2018 11:18:24 AM | A | DONE |
|
|
Bob Phone #: ###-####
|
BLD17-04590
| BLD-Wall Bracing | 6/28/2018 | 6/29/2018 | 6/29/2018 10:54:07 AM | A | PASS |
|
|
Jeff Phone #: ###-#### East 1/2 of Foundation Wall.....OK
|
BLD18-01861
| BLD-Final | 6/28/2018 | 6/29/2018 | 6/29/2018 10:01:15 AM | A | PASS |
|
|
Covertech Phone #: ###-####
|
BLD18-01328
| BLD-Conference | 6/28/2018 | 6/29/2018 | 6/29/2018 9:43:02 AM | A | PASS |
|
|
Phone #: 2089723899 >> Inspection requested via mobile web by Larry O'Leary Foundation wall....OK.
|
BLD16-01059
| BLD-Final | 6/28/2018 | 6/29/2018 | 6/29/2018 9:15:04 AM | A | PASS |
|
|
looks like everyone has signed off but you only have a partial final OK for perm Occ.
|
BLD16-01060
| BLD-Final | 6/28/2018 | 6/29/2018 | 6/29/2018 9:14:18 AM | A | PASS |
|
|
looks like everyone has signed off but you only have a partial final I made a mistake, and found out that Pool has a seperate permit. Scheduled inspections to get pool finaled and OK for Perm Occ on this permit.
|