Inspections for the day of: Monday, June 3, 1996.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM96-01451 INSP - Final5/31/19966/3/19966/3/1996 12:00:00 AMAFAIL
05/31/96 330 - ITE MAINTENCE STORAGE AREA water lines covered without inspection, inan area that I dont beleave is have pottable water access, hazardous chemical storage area in the site maintenance yard
PLM96-01454 INSP - Ground Work/Sewer/Water5/31/19966/3/19966/3/1996 12:00:00 AMAPASS
05/31/96 330 -
PLM96-00931 INSP - Plumbing Rough-in5/31/19966/3/19966/3/1996 12:00:00 AMAPASS
05/31/96 330 -
PLM96-00977 INSP - Plumbing Rough-in6/3/19966/3/19966/3/1996 12:00:00 AMPPASS
06/03/96 330 - 4 W/C 6 LAV 4 TUB/SHOWER 1 W/H 1 W/B 1 SINK AND A LAUNDRY
PLM96-00523 INSP - Final6/3/19966/3/19966/3/1996 12:00:00 AMPPASS
06/03/96 330 - 4:30 IF POSSIBLE
PLM96-01473 INSP - Water softener6/3/19966/3/19966/3/1996 12:00:00 AMPNR
06/03/96 330 - 2:00 PM PER BILL. THIS IS FOR FRIDAY AT 2PM
PLM96-01496 INSP - Plumbing Rough-in6/3/19966/3/19966/3/1996 12:00:00 AMPPART
06/03/96 330 - AFTER 3:00 P.M. PLEASE. GROUND WORK ONLY 3 W/C 3 LAV 3 TUB/SHOWER 1 SINK 1 W/B 1 W/H
PLM96-01499 INSP - Plumbing Rough-in6/3/19966/3/19966/3/1996 12:00:00 AMPPASS
06/03/96 330 - BASIC 9 FIXTURES
PLM96-01501 INSP - Plumbing Rough-in6/3/19966/3/19966/3/1996 12:00:00 AMPPASS
06/03/96 330 - BASIC 9 FIXTURES