BLD02-01183
| BLD-Foundation | 5/31/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | NR |
|
|
chuck ###-#### found wall no forms or plans, recall. 6/3/2002 11:22:38 AM
|
BLD01-02632
| BLD-Final | 5/31/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | NR |
|
|
###-#### PAUL...need fire 1st 6/3/2002 2:40:33 PM
|
BLD02-00150
| BLD-Final | 5/31/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/31/2002 at 14:50:51. Contact: ###-####.
|
BLD02-00384
| BLD-Framing/Rough-in | 5/31/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | PART |
|
|
###-#### walls ok, follow up w/ t/i. 6/3/2002 11:03:43 AM
|
BLD01-02608
| BLD-Framing/Rough-in | 5/31/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | PART |
|
|
###-#### walls ok, follow w/ t/i 6/3/2002 11:04:00 AM
|
BLD02-00710
| BLD-Foundation | 6/2/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/02/2002 at 18:26:56. Contact: ###-####...east portion walls ok to pour. 6/3/2002 11:53:16 AM
|
BLD02-00150
| BLD-Framing/Rough-in | 6/3/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | PART |
|
|
corridor peneterations...45 min glazing assy's...partitions ...ok
|
BLD02-00720
| BLD-Conference | 6/3/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | P | PASS |
|
|
darren...re spec insp req's; need scope -of- work statement...Strata has been onsite, left initial written report, no apparent discrepancies for 1st lift, east side of bridge 6/3/2002 3:36:15 PM
|
BLD02-01183
| BLD-Foundation | 6/3/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | P | PART |
|
|
###-#### CHUCK house walls ok 6/3/2002 3:39:11 PM
|
BLD02-00720
| BLD-Concrete | 6/3/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | P | PART |
|
|
masonry, 1st lift, east side...visual insp ok...has spec. insp.
|
BLD01-00355
| BLD-Conference | 6/3/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | P | PASS |
|
|
w/ A-1 htg...will add BBQ to permit
|
BLD02-00314
| BLD-Other | 6/2/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/02/2002 at 22:14:38. Contact: ###-####....grid ok, combustible framing near hood is "gypped"...awaiting spec insp report(s) for Hilti epoxy anchors.. 6/3/2002 4:23:51 PM
|
MEC01-01687
| Final | 6/3/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 09:29:52. Contact: ###-####...need bbq on permit, recall. other permit this address exp'd?? 6/3/2002 4:32:47 PM
|