BLD02-00532
| BLD-Conference | 5/31/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | CANC |
|
|
MIKE ###-####
|
BLD02-00531
| BLD-Conference | 5/31/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | CANC |
|
|
MIKE ###-####
|
BLD02-00340
| BLD-Framing/Rough-in | 5/31/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | FAIL |
|
|
CEILING INSP- MIKE- ###-#### . light cans need wires called this number waiting for return call contractor not on site. 6/3/2002 4:57:36 PM
|
BLD02-00783
| BLD-Framing/Rough-in | 5/31/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | FAIL |
|
|
###-####. staple above hold downs. 6/3/2002 11:24:50 AM
|
MEC02-01443
| Final | 6/3/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 07:12:34. Contact: ###-####.all ok except gas log unit not installed, recall when ready contractor on site. 6/3/2002 11:41:58 AM
|
MEC02-01443
| Pressure Test | 6/3/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 07:12:53. Contact: ###-####.done by gas co. 6/3/2002 11:40:31 AM
|
BLD01-00736
| BLD-Framing/Rough-in | 6/3/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | P | CANC |
|
|
CLAY ###-####
|
BLD02-00783
| BLD-Framing/Rough-in | 6/3/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 407 On 6/3/2002 11:25:04 AM
|
MEC01-02624
| Pressure Test | 5/31/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | P | PART |
|
|
###-#### late pm low press to equip in mech room ok...3 furn to conf room ok...reg vented outside....low pressure to east end furn all floors ok 6/3/2002 2:35:48 PM
|
BLD02-00691
| BLD-Framing/Rough-in | 5/31/2002 | 6/3/2002 | 6/3/2002 12:00:00 AM | P | PART |
|
|
Don, ###-####. needs electrical and braces at top walls. 6/3/2002 4:56:46 PM
|