ELE03-03039
| ELE-Aging Inspection | 6/3/2004 | 6/3/2004 | 6/3/2004 12:00:00 AM | | DONE |
|
|
suc 6/3/2004 9:37:57 AM
|
ELE04-01406
| Permanent Service | 6/3/2004 | 6/3/2004 | 6/3/2004 12:00:00 AM | A | PASS |
|
|
p/s o/h n ok
|
ELE04-01619
| Rough-In Permanent Service | 6/2/2004 | 6/3/2004 | 6/3/2004 12:00:00 AM | A | PASS |
|
|
Darrell ###-####
rough ok
p/s o/h n ok 6/3/2004 9:36:13 AM
|
ELE04-00220
| Final | 6/2/2004 | 6/3/2004 | 6/3/2004 12:00:00 AM | A | FAIL |
|
|
gene; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
210.70A3 light and switch in crawl space 6/3/2004 9:11:45 AM
|
ELE04-01605
| Electrical Rough-In | 6/2/2004 | 6/3/2004 | 6/3/2004 12:00:00 AM | A | PASS |
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
rough ok 6/3/2004 9:52:49 AM
|
ELE04-01515
| Temporary Service | 6/3/2004 | 6/3/2004 | 6/3/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/3/2004 at 6:23:38 AM. Contact: ###-####.
t/s u/g n ok 6/3/2004 2:47:02 PM
|
ELE04-01629
| Rough-In Permanent Service | 6/3/2004 | 6/3/2004 | 6/3/2004 12:00:00 AM | P | PASS |
|
|
###-#### roger
rough ok survey 210.52 recep spacing kitchen and wall outlets on first floor
p/s u/g n ok 6/3/2004 5:24:53 PM
|
ELE04-01630
| Rough-In Permanent Service | 6/3/2004 | 6/3/2004 | 6/3/2004 12:00:00 AM | P | PASS |
|
|
###-#### roger
rough ok survey 210.52 recep spacing on main floor left of the entry way
p/s u/g n ok 6/3/2004 5:23:45 PM
|
ELE04-01626
| Electrical Rough-In | 6/3/2004 | 6/3/2004 | 6/3/2004 12:00:00 AM | P | PASS |
|
|
rough ok 6/3/2004 11:39:32 AM
|