ELE05-01884
| Electrical Rough-In | 6/3/2005 | 6/3/2005 | 6/3/2005 2:40:48 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/3/2005 at 11:08:09 AM. Contact: ###-####.ceilings ok
|
ELE05-01931
| Electrical Rough-In | 6/2/2005 | 6/3/2005 | 6/3/2005 2:02:26 PM | P | PART |
|
|
ANY QUESTIONS PLEASE CALL ED SCHALLOCK; Phone #: ###-#### Internet Inspection Request from: Jeff Radford u/f for p/s and east end parking lot u/g 2 locations
|
ELE05-00229
| Final | 6/3/2005 | 6/3/2005 | 6/3/2005 1:43:06 PM | P | PASS |
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok card signed
|
ELE05-00976
| Final | 6/3/2005 | 6/3/2005 | 6/3/2005 1:42:44 PM | P | NH |
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa no access called
|
ELE05-01353
| Final | 6/3/2005 | 6/3/2005 | 6/3/2005 12:52:44 PM | P | PASS |
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok no card
|
ELE05-01938
| Temporary Service | 6/3/2005 | 6/3/2005 | 6/3/2005 11:46:52 AM | P | PASS |
|
|
rick ###-#### t/s u/g new ok
|
ELE05-00459
| Final | 6/2/2005 | 6/3/2005 | 6/3/2005 10:34:17 AM | A | FAIL |
|
|
henry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa cor. posted called needs instructions for j-tub, is paddle fan listed for outdoors, 250.148 grd metal boxes island, 300.10&314.3 no metal raceways in plastic boxes mech. rm furnace, 200.6&7 ID white in cables as phase where used as, 404.4 WP for outdoor switches, 408.4 label panels correctly, no power to recept front entry, wire DW
|
ELE04-03719
| Final | 6/2/2005 | 6/3/2005 | 6/3/2005 9:55:45 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Therrin Robertsonok
|
ELE05-01917
| Electrical Rough-In | 6/2/2005 | 6/3/2005 | 6/3/2005 8:54:46 AM | A | PART |
|
|
morrey; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles shall not use plastic boxes with metal raceway, needs connectors for romex at boxes, shall not switch neutral, splice all grds
|
ELE05-01920
| Electrical Rough-In | 6/2/2005 | 6/3/2005 | 6/3/2005 8:26:16 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 6/2/2005 at 1:19:03 PM. Contact: ###-####. u/g for center runway running N and S west end runway, and new vault
|