ELE08-00533
| ELE-Aging Inspection | 6/3/2008 | 6/3/2008 | 6/9/2008 12:18:02 PM | | NR |
|
|
signs not yet installed
|
ELE08-01390
| Electrical Rough-In | 6/3/2008 | 6/3/2008 | 6/3/2008 4:00:58 PM | P | PART |
|
|
joe Phone #: ###-#### no esc permit walls ok
|
ELE08-01468
| DOC - Permit Finaled | 6/3/2008 | 6/3/2008 | 6/3/2008 3:13:55 PM | P | PASS |
|
|
pass
|
ELE08-00408
| Final | 6/3/2008 | 6/3/2008 | 6/3/2008 3:04:37 PM | P | PASS |
|
|
BILL....... Phone #: ###-#### Internet Inspection Request from: Bob Glenn
|
ESC08-00040
| General Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 3:03:29 PM | P | PASS |
|
|
corrections appear to have been made
|
ELE08-01469
| Electrical Rough-In | 6/3/2008 | 6/3/2008 | 6/3/2008 2:47:13 PM | P | CANC |
|
|
jim Note: floor heat in bathroom Phone #: ###-#### this is a dead zone for phone and with confusion in notes will reschedual.
|
ELE08-01481
| Electrical Rough-In | 6/3/2008 | 6/3/2008 | 6/3/2008 1:55:37 PM | P | PART |
|
|
john Phone #: ###-#### No ESC permit Plans on site. Wall R/I Ok
|
ESC07-01142
| General Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 1:34:11 PM | P | PASS |
|
|
no dirt loose on property
|
ELE08-00387
| Final | 6/3/2008 | 6/3/2008 | 6/3/2008 1:28:54 PM | P | PASS |
|
|
final on house, any questions call George @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose
|
ELE08-01465
| Electrical Rough-In | 6/2/2008 | 6/3/2008 | 6/3/2008 1:00:05 PM | A | PART |
|
|
Call Joe if neeeded for rough in inspection of single wall on north east corner of 5th floor. Phone #: ###-#### Internet Inspection Request from: Loren Ramsey walls ok no ESC permit plans on site
|
ELE08-01463
| Electrical Rough-In | 6/2/2008 | 6/3/2008 | 6/3/2008 11:00:50 AM | A | PASS |
|
|
6 switches ready for inspection Phone #: ###-#### Internet Inspection Request from: gary batten
|
ELE08-01463
| DOC - Permit Finaled | 6/3/2008 | 6/3/2008 | 6/3/2008 11:00:35 AM | P | PASS |
|
|
|
ELE08-01468
| Conference | 6/2/2008 | 6/3/2008 | 6/3/2008 10:31:18 AM | A | PART |
|
|
conference to see how much has to be repaired. Phone #: ###-#### Internet Inspection Request from: Andy Derrick this is a repair grounding will be brought up to code as well as clearance in front of panel and increase to #4 wire size in raceway. no esc permit
|
ELE08-01368
| Electrical Rough-In | 6/2/2008 | 6/3/2008 | 6/3/2008 10:30:53 AM | A | PART |
|
|
mike Phone #: ###-#### ok to cover all but kitchen and T-stat walls replace boxes with unused openings in kitchen/garage wall ground metal boxes make up all ground wires install proper sized boxes in the kitchen in the corner of the counter. change metal fitings to plastic in T-stat box. no esc permit
|
ELE08-00597
| Electrical Rough-In | 6/2/2008 | 6/3/2008 | 6/3/2008 10:30:05 AM | A | PASS |
|
|
nead ok to cover for the kitchen area or what we call phase 2 of the prodject. Phone #: ###-#### Internet Inspection Request from: John Edwards no sec
|