ELE06-03173
| ELE-Aging Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 4:10:01 PM | | DONE |
|
|
contractor still waiting to get paid before closing permit
|
ELE06-03468
| ELE-Aging Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 4:08:12 PM | | DONE |
|
|
contractor supposed to call for inspection
|
ELE08-00100
| Final | 6/3/2008 | 6/3/2008 | 6/3/2008 4:06:33 PM | P | PART |
|
|
Phase 2 first floor. Phone #: ###-#### Internet Inspection Request from: Todd Sellman called contractor, people moved into offices, construction material fills rest of offices, no access to test all receptacles, switch and receptacle covers missing in room on left on entry and 1 office missing receptacle plate,no prints or general contractor available, need to check for dual level light switching rear offices, need to find listing on furniture in center of room, and see how many circuits to power pole and furniture, need to finish panel schedule, did not leave correction notice, but contractor will call in again when ready
|
ESC07-00611
| General Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 3:33:09 PM | P | PASS |
|
|
looked ok
|
ESC08-00264
| General Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 3:10:55 PM | P | PASS |
|
|
looked ok
|
ESC05-01531
| General Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 3:09:36 PM | P | PASS |
|
|
looked ok
|
ELE07-03352
| Permanent Service | 6/3/2008 | 6/3/2008 | 6/3/2008 2:56:49 PM | P | PASS |
|
|
steve Phone #: ###-#### p/s u/g n ok, sticker by meter on transformer
|
ELE08-00593
| Permanent Service | 6/3/2008 | 6/3/2008 | 6/3/2008 2:12:16 PM | P | PASS |
|
|
sam Phone #: ###-#### corrections made, p/s o/h rec ok- needs 1 meter for meter pak- 3 are in place already
|
ELE08-01101
| Final | 6/3/2008 | 6/3/2008 | 6/3/2008 1:39:01 PM | P | FAIL |
|
|
jeriamiah Note:please call 1/2 hr prior to inspection Phone #: ###-#### met contractor, left correction notice, NEC 110.3 (B) listed or labeled equipment shall be installed and used in accordance with any instructions included, BCC 4-05-33(A)&(B) equipment shall bear the mark of a nationally recognized testing laboratory,( hot tub)
|
ELE08-00841
| Final | 6/3/2008 | 6/3/2008 | 6/3/2008 1:01:13 PM | P | PASS |
|
|
andy - please call for access Phone #: ###-#### corrections made, ok to final, no esc
|
ELE08-00176
| Final | 6/2/2008 | 6/3/2008 | 6/3/2008 10:36:20 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/2/2008 at 3:30:38 PM. Contact: ###-####. ok to final, no esc
|
ELE06-03440
| ELE-Aging Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 10:02:50 AM | | DONE |
|
|
could not find contractor to call with directions, no esc
|
ELE08-01424
| Electrical Rough-In | 6/2/2008 | 6/3/2008 | 6/3/2008 9:43:49 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: JENNY EMEL walls only ok to cover, no esc
|
ELE08-01466
| Electrical Rough-In | 6/2/2008 | 6/3/2008 | 6/3/2008 8:53:48 AM | A | PASS |
|
|
new new store front rough inspection suite 100, 154, 158 (all are being made into one suite) Phone #: ###-#### Internet Inspection Request from: Lloyd Looney store fronts only ok to cover for suites listed, no esc
|
ELE08-01169
| Final | 6/2/2008 | 6/3/2008 | 6/3/2008 8:06:42 AM | A | PASS |
|
|
scott Phone #: ###-#### ok to final, signed occupancy card, no esc
|