ESC07-01297
| Conference | 6/3/2008 | 6/3/2008 | 6/4/2008 2:26:57 PM | P | PART |
|
|
Vast improvements overall. Walked site with RP, Clint (ESC) and Tom A. (Bld inspector). Additional items still require attention plus reviewed the need to perform weekly inspection and maintance. Reviewed scope of work to abandon existing storm drain system. Still need to keep drop inlets free of polluants and allow water to flow offsite until new system is in place and operating. Refer to ESC07-01834 and ESC07-01299.
|
ESC08-00400
| General Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 2:49:12 PM | P | PART |
|
|
Overall site looks good; Need to protect interior drop inlets. Rain was occurring during inspection and noticed sheet flow on hard surface carring sediment. Need to sweep hard surface to reduce sediment. River side of project has protection. Concrete washout is signed and in place.
|
ESC08-00230
| General Inspection | 5/29/2008 | 6/3/2008 | 6/3/2008 2:13:49 PM | P | PASS |
|
|
Dewater ok; Water has fine clarity; Ok to discharge water if clean by by-passing the filter tanks. Will follow up.
|