BLD08-00388
| BLD-Aging Inspection | 6/3/2008 | 6/3/2008 | 6/6/2008 1:50:35 PM | | PASS |
|
|
exps on 8/31
|
BLD08-00659
| BLD-Framing/Rough-in | 6/3/2008 | 6/3/2008 | 6/4/2008 8:36:54 AM | P | PART |
|
|
rick Phone #: ###-#### ok to cover store fronts
|
BLD08-01120
| BLD-Framing/Rough-in | 6/2/2008 | 6/3/2008 | 6/4/2008 8:36:20 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 6/2/2008 at 2:17:07 PM. did a walk thru with framer everything looks good but needs to get other trades to finish their work and get r/i signed off
|
BLD08-00521
| BLD-Final | 6/3/2008 | 6/3/2008 | 6/3/2008 2:59:43 PM | P | PASS |
|
|
Rob Phone #: ###-#### ok for perm occ
|
BLD08-00835
| BLD-Wall cover | 6/3/2008 | 6/3/2008 | 6/3/2008 2:02:33 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/3/2008 at 7:06:49 AM. Contact: ###-####.
|
BLD08-01124
| BLD-Wall cover | 6/3/2008 | 6/3/2008 | 6/3/2008 2:02:09 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/3/2008 at 7:05:16 AM. Contact: ###-####.
|
BLD07-02914
| BLD-Final | 6/2/2008 | 6/3/2008 | 6/3/2008 11:56:24 AM | A | PASS |
|
|
justin Phone #: ###-#### ok for perm occ
|
BLD08-00197
| BLD-Framing/Rough-in | 5/30/2008 | 6/3/2008 | 6/3/2008 10:57:50 AM | A | PART |
|
|
jay - ceiling cover Phone #: ###-####ok to cover need to check draft stops
|
BLD08-00666
| BLD-Energy code compliance | 6/2/2008 | 6/3/2008 | 6/3/2008 10:43:35 AM | A | PASS |
|
|
noah Phone #: ###-####
|
BLD08-00857
| BLD-Framing/Rough-in | 6/2/2008 | 6/3/2008 | 6/3/2008 9:15:15 AM | A | PASS |
|
|
mike Phone #: ###-#### also ext perm insulation around foundation ok to back fill
|