BLD09-00190
| BLD-Aging Inspection | 6/3/2009 | 6/3/2009 | 6/4/2009 2:02:54 PM | | NR |
|
|
|
ESC08-00994
| Random Inspection | 6/3/2009 | 6/3/2009 | 6/3/2009 3:14:27 PM | P | FAIL |
|
|
need protection of di at entryway off of annmorison.
|
BLD08-02428
| BLD-Conference | 6/3/2009 | 6/3/2009 | 6/3/2009 3:11:00 PM | P | PART |
|
|
shell ok to the point of life saftey and bonded for completion of work with p&z. ec and bld finals to be performed on unleased area north of ti.
|
BLD08-02429
| BLD-Conference | 6/3/2009 | 6/3/2009 | 6/3/2009 3:09:04 PM | P | PART |
|
|
tr signed off for pw/ on temp with p/z
|
BLD09-00337
| BLD-Final | 6/3/2009 | 6/3/2009 | 6/3/2009 3:00:02 PM | P | PART |
|
|
temp ok for ti occ. 90 days.
|
BLD09-00776
| BLD-Final | 6/3/2009 | 6/3/2009 | 6/3/2009 2:56:24 PM | P | FAIL |
|
|
phil Phone #: ###-####
|
BLD08-02517
| BLD-Final | 6/3/2009 | 6/3/2009 | 6/3/2009 2:45:17 PM | P | PART |
|
|
richard - please call 1/2 hr prior Phone #: ###-#### first phase ok for occ.
|
BLD09-00803
| BLD-Final | 6/2/2009 | 6/3/2009 | 6/3/2009 12:16:41 PM | P | PASS |
|
|
John Phone #: ###-#### final ok
|
ESC09-00221
| Site Preparation | 6/3/2009 | 6/3/2009 | 6/3/2009 10:45:29 AM | A | PART |
|
|
|
BLD09-00619
| BLD-Foundation | 6/2/2009 | 6/3/2009 | 6/3/2009 10:45:04 AM | A | PASS |
|
|
Clayt Phone #: ###-####
|
ESC09-00280
| Random Inspection | 6/3/2009 | 6/3/2009 | 6/3/2009 10:43:57 AM | A | PART |
|
|
|
BLD09-00762
| BLD-Foundation | 6/2/2009 | 6/3/2009 | 6/3/2009 10:28:08 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/2/2009 at 5:55:50 PM. Contact: ###-####.
|