Inspections for the day of: Wednesday, June 3, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE09-00703 Final6/3/20096/3/20096/3/2009 4:05:08 PMPPASS
call first Phone #: ###-#### Internet Inspection Request from: PAT MILLER ok
ELE09-00636 Electrical Rough-In6/3/20096/3/20096/3/2009 4:04:46 PMPPART
field evaluation for refer units ok
ELE09-00636 Conference6/3/20096/3/20096/3/2009 4:03:49 PMPDONE
needs grding for xformers and p/s load side xformers
ELE09-00694 Permanent Service6/3/20096/3/20096/3/2009 4:02:19 PMPNR
This inspection will be a follow-up from yesterday for all 3 p/s. Contact is Rey. Thank you and please have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw
412 and myself met contr , not ready shall have all p/s conductors terminated at xformer, grding , bonding, ok at all 3 locations , still needs labels will check that at time of final
ELE09-00881 Conference6/3/20096/3/20096/3/2009 3:05:22 PMPDONE
As a new contractor on the job, I would like to get up to speed on what Boise City is expecting for some of the "control" boxes / motor - "start", "stop" locations. (Can we buy our enclosures and then install the Start & Stop buttons ourselves as needed? Or, must the whole assembly be UL listed as a preassembled unit and we cannot add or remove buttons as needed?) Phone #: ###-#### Internet Inspection Request from: nathan palmer
412 and myself met with ele contr told him what will be required, all wiring will meet NEC requirements, for installation and listing
ELE09-00944 Permanent Service6/3/20096/3/20096/3/2009 10:22:16 AMAPASS
rob - ###-#### p/s o/h new ok
ELE09-00944 Final6/3/20096/3/20096/3/2009 10:21:57 AMAPASS
rob - ###-####
ELE09-00636 Electrical Rough-In6/2/20096/3/20096/3/2009 10:19:23 AMAPART
Contact: Tim Watkins Phone #: ###-#### Internet Inspection Request from: Melissa Kaae grd for xformers, p/s rated disconnect secondary side called
ELE09-00948 Rough-In Permanent Service6/3/20096/3/20096/3/2009 10:16:48 AMAPASS
###-#### called makeup outside light box, free length, one neutral per lug,
r/i p/s u/g new ok
ELE09-00948 Final6/2/20096/3/20096/3/2009 10:15:13 AMANR
Phone #: ###-#### Internet Inspection Request from: Darryn Coburn
ELE09-00949 Electrical Rough-In6/2/20096/3/20096/3/2009 9:44:52 AMAPASS
call prior to inspection-mucho Phone #: ###-#### ok
ELE08-02938 Final6/2/20096/3/20096/3/2009 8:39:36 AMANH
Phone #: ###-#### Internet Inspection Request from: Trent see added fee due
ELE09-00944 Final6/2/20096/3/20096/3/2009 12:00:00 AMACANC
service on pole located in back parking lot on West side by Idaho power power pole need service inspected for taco truck. Any questions call Rob @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose