ESC09-00211
| Complaint Inspection | 6/3/2009 | 6/3/2009 | 6/3/2009 2:57:48 PM | P | FAIL |
|
|
Complaint from ACHD regarding trackout, verbal correction to RP to install better working trackout controls and to have workers park offsite whenever possible.
|
ESC09-00211
| Tracking Control | 6/3/2009 | 6/3/2009 | 6/3/2009 2:56:12 PM | P | FAIL |
|
|
Needs better controls inside the fence to reduce trackout. Verbal to RP
|
ESC08-00457
| Random Inspection | 6/3/2009 | 6/3/2009 | 6/3/2009 2:54:10 PM | P | FAIL |
|
|
Verbal to RP: Concrete washout is overflowing, needs sweeping of trackout along Nez Pierce. Complete by the end of the day of 6/8/09. Will follow up.
|
ESC08-00211
| Random Inspection | 6/3/2009 | 6/3/2009 | 6/3/2009 2:47:29 PM | P | PASS |
|
|
|
ESC08-00575
| Site Final | 6/3/2009 | 6/3/2009 | 6/3/2009 2:01:41 PM | A | PART |
|
|
Reviewed status of project with Hopkins Financial regarding requirement of ESC. Site has fairly consistent top growth of coverage but BMPs and dirt in gutter pan exists at misc. areas. Not ready to final.
|
ESC09-00286
| Conference | 6/1/2009 | 6/3/2009 | 6/3/2009 1:58:27 PM | A | DONE |
|
|
9:00am Meet with Ground FX and Knife River over the implimenting the ESC/SWPPP plan. Met with Knife River, Dave Powell, (RiverRidge), Ground FX for erosion control discussion regarding upcoming project.
|
ESC06-00030
| Random Inspection | 6/3/2009 | 6/3/2009 | 6/3/2009 1:58:24 PM | P | PART |
|
|
|