BLD09-00437
| BLD-Framing/Rough-in | 6/3/2009 | 6/3/2009 | 6/3/2009 3:59:37 PM | P | PASS |
|
|
bieu Phone #: ###-####
|
BLD09-00437
| DOC - Permit Finaled | 6/3/2009 | 6/3/2009 | 6/3/2009 3:59:30 PM | P | PASS |
|
|
|
BLD09-00788
| BLD-Concrete | 6/2/2009 | 6/3/2009 | 6/3/2009 10:04:56 AM | A | PASS |
|
|
tom Phone #: ###-####
|
ESC09-00285
| Site Preparation | 6/3/2009 | 6/3/2009 | 6/3/2009 10:04:47 AM | A | PASS |
|
|
ESC permit signposted. No conc. washout required due to size of job.
|
BLD08-01593
| BLD-Final | 6/2/2009 | 6/3/2009 | 6/3/2009 9:40:25 AM | A | FAIL |
|
|
Angela Phone #: ###-####. Needs plumbing final. Also needs to proveide egress ladder in window well.
|