Inspections for the day of: Friday, June 3, 2011.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC11-01612 Final6/1/20116/3/20116/3/2011 4:23:15 PMPPASS
MEC11-01124 Conference6/3/20116/3/20116/3/2011 3:42:37 PMPPASS
need opion on unit heater venting into loading dock
wrote c/n that manufacture wants heater vented to the outdoors, not into the loading dock bays
MEC11-01325 Final6/2/20116/3/20116/3/2011 3:13:35 PMPPASS
MEC11-01606 Final6/1/20116/3/20116/3/2011 3:04:04 PMPPASS
MEC11-01643 Rough-in6/3/20116/3/20116/3/2011 2:37:27 PMPPART
f/p ok on 3rd floor, on bldg 3
MEC11-01523 Rough-in6/1/20116/3/20116/3/2011 1:34:49 PMPNR
no approved plans on site
did witness duct blaster test
test ok
MEC11-01562 Final6/2/20116/3/20116/3/2011 1:26:46 PMPPASS
MEC11-01516 Rough-in6/2/20116/3/20116/3/2011 11:49:42 AMAPASS
ok for cover
MEC08-01221 Pressure Test6/2/20116/3/20116/3/2011 11:05:25 AMAPART
pressure test witnessed for 2,3,4th floor corridors. 100# test on 100# guage ok
MEC10-03912 Final6/2/20116/3/20116/3/2011 11:00:38 AMAPASS
MEC11-01124 Rough-in6/3/20116/3/20116/3/2011 11:00:25 AMAPART
all fire dampers installed as per manufacture instructions, ok for cover
MEC11-01628 Final6/2/20116/3/20116/3/2011 10:00:14 AMAPASS
MEC11-01517 Conference5/27/20116/3/20116/3/2011 10:00:03 AMAPASS
MEC11-01495 Final6/1/20116/3/20116/3/2011 9:38:36 AMANR
missing filter door
MEC10-03518 Final6/2/20116/3/20116/3/2011 9:29:07 AMAPASS