Inspections for the day of: Friday, June 3, 2011.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-01111 FIRE-Final Inspection6/3/20116/3/20116/3/2011 6:20:38 PMPFAIL
Correction items include; provide approved hardware at the restroom, the fire extinguisher is overdue annual certification, remove the manual thumbturn at the main entry/exit, address numbers should be located on a contrasting backround.
BLD09-00510 FIRE-Sprinkler Rough-in6/3/20116/3/20116/3/2011 6:14:21 PMPPART
New fire sprinkler work at units 104 and 204 approved for cover.
BLD11-00715 FIRE-Conference6/3/20116/3/20116/3/2011 6:11:35 PMPDONE
Discussion with contractor regarding items for fire life safety final including door hardware, ceiling cover, existing duct detectors and project related fire sprinkler permit.
FIR10-00540 INSP-Sprinkler Rough-in6/3/20116/3/20116/3/2011 6:08:29 PMPPART
Overhead fire sprinkler work at the first floor classrooms 114 and 107 and restrooms 111 and 112 are okay to cover at the drop ceilings. See clouded areas on plan set with today's date.
BLD11-00422 FIRE-Final Inspection6/3/20116/3/20116/3/2011 6:05:42 PMPPASS
Fire life safety inspection passed. Signature card not available on site.
BLD11-00544 FIRE-Conference6/3/20116/3/20116/3/2011 12:17:50 PMADONE
Regarding project related fire sprinkler work.
BLD11-01112 FIRE-Final Inspection6/3/20116/3/20116/3/2011 12:15:52 PMAPASS
Noted corrections finished. Life safety passed.