BLD11-01111
| FIRE-Final Inspection | 6/3/2011 | 6/3/2011 | 6/3/2011 6:20:38 PM | P | FAIL |
|
|
Correction items include; provide approved hardware at the restroom, the fire extinguisher is overdue annual certification, remove the manual thumbturn at the main entry/exit, address numbers should be located on a contrasting backround.
|
BLD09-00510
| FIRE-Sprinkler Rough-in | 6/3/2011 | 6/3/2011 | 6/3/2011 6:14:21 PM | P | PART |
|
|
New fire sprinkler work at units 104 and 204 approved for cover.
|
BLD11-00715
| FIRE-Conference | 6/3/2011 | 6/3/2011 | 6/3/2011 6:11:35 PM | P | DONE |
|
|
Discussion with contractor regarding items for fire life safety final including door hardware, ceiling cover, existing duct detectors and project related fire sprinkler permit.
|
FIR10-00540
| INSP-Sprinkler Rough-in | 6/3/2011 | 6/3/2011 | 6/3/2011 6:08:29 PM | P | PART |
|
|
Overhead fire sprinkler work at the first floor classrooms 114 and 107 and restrooms 111 and 112 are okay to cover at the drop ceilings. See clouded areas on plan set with today's date.
|
BLD11-00422
| FIRE-Final Inspection | 6/3/2011 | 6/3/2011 | 6/3/2011 6:05:42 PM | P | PASS |
|
|
Fire life safety inspection passed. Signature card not available on site.
|
BLD11-00544
| FIRE-Conference | 6/3/2011 | 6/3/2011 | 6/3/2011 12:17:50 PM | A | DONE |
|
|
Regarding project related fire sprinkler work.
|
BLD11-01112
| FIRE-Final Inspection | 6/3/2011 | 6/3/2011 | 6/3/2011 12:15:52 PM | A | PASS |
|
|
Noted corrections finished. Life safety passed.
|