FIR11-00130
| INSP-Supply line flush | 6/2/2011 | 6/3/2011 | 6/3/2011 2:50:08 PM | P | CANC |
|
|
Per Tyler this is to be rescheduled for monday due to a United Water scheduling conflict.
|
FIR11-00105
| INSP-Final Inspection | 6/2/2011 | 6/3/2011 | 6/3/2011 2:37:26 PM | P | FAIL |
|
|
All items passed except the inspectors test did not have the correct orfice to test through. To final the project the flow switch, verification of this signal and a record of completion is needed.
|
BLD11-00822
| FIRE-Final Inspection | 6/3/2011 | 6/3/2011 | 6/3/2011 12:04:08 PM | A | PASS |
|
|
Life safety passed
|
FIR11-00193
| INSP-Final Inspection | 6/3/2011 | 6/3/2011 | 6/3/2011 12:03:49 PM | P | PASS |
|
|
Permit finaled
|
FIR11-00247
| INSP-Sprinkler Rough-in | 6/2/2011 | 6/3/2011 | 6/3/2011 9:54:12 AM | A | PASS |
|
|
The in-building riser is ok to cover. No other piping has been installed.
|