Inspections for the day of: Friday, June 3, 2011.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00130 INSP-Supply line flush6/2/20116/3/20116/3/2011 2:50:08 PMPCANC
Per Tyler this is to be rescheduled for monday due to a United Water scheduling conflict.
FIR11-00105 INSP-Final Inspection6/2/20116/3/20116/3/2011 2:37:26 PMPFAIL
All items passed except the inspectors test did not have the correct orfice to test through. To final the project the flow switch, verification of this signal and a record of completion is needed.
BLD11-00822 FIRE-Final Inspection6/3/20116/3/20116/3/2011 12:04:08 PMAPASS
Life safety passed
FIR11-00193 INSP-Final Inspection6/3/20116/3/20116/3/2011 12:03:49 PMPPASS
Permit finaled
FIR11-00247 INSP-Sprinkler Rough-in6/2/20116/3/20116/3/2011 9:54:12 AMAPASS
The in-building riser is ok to cover. No other piping has been installed.