Inspections for the day of: Monday, June 3, 2013.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-01109 Final6/3/20136/3/20136/3/2013 4:35:16 PMPPASS
corrections made and need ok from Idaho power to restore Phone #: ###-#### >> Inspection requested via web by Randy Fletcher
Corrections made Final ok
ELE13-01109 Permanent Service6/3/20136/3/20136/3/2013 4:34:32 PMPPASS
corrections made and need ok from Idaho power to restore Phone #: ###-#### >> Inspection requested via web by Randy Fletcher
p/s o/h rec ok
ELE12-00730 Final6/3/20136/3/20136/3/2013 4:19:28 PMPFAIL
Jeff Creek ###-#### Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek
1. Breakers in panel shall be same brand and listed for that manufacturer.
2. Spark rings shall be installed where box does not cover combustible material.
3. Boiler receptical shall be GFCI protected.
ELE11-01478 Conference6/3/20136/3/20136/3/2013 3:38:49 PMPCANC
Vance-Please call at least 30 mins prior Phone #: ###-#### Needed rough in inspection
ELE11-01478 Electrical Rough-In6/3/20136/3/20136/3/2013 3:37:40 PMPPASS
Vance-Please call at least 30 mins prior Phone #: ###-#### Master hall and bathroom rough in ok cover
ELE13-00225 Final5/31/20136/3/20136/3/2013 3:12:43 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Zane Robertson
Final ok
ELE13-00388 Final6/3/20136/3/20136/3/2013 2:10:29 PMPPART
Phone #: ###-#### >> Inspection requested via web by Eric Brown
Main level only. Final ok. Contractor to mark circuits for owners to ensure power left off to open boxes in basement
ELE13-00173 Final6/3/20136/3/20136/3/2013 1:47:50 PMPPASS
Phone #: ###-#### >> Inspection requested via web by PAT MILLER
Final ok
GCE13-00085 GCE-Permanent Service6/3/20136/3/20136/3/2013 1:23:53 PMAPASS
###-#### Dan p/s o/h n ok
ELE13-01027 Electrical Rough-In6/1/20136/3/20136/3/2013 10:36:00 AMAPASS
I will not be there until about 10:00am and I would like to be there to walk it with you. I hope that is not a problem. Phone #: ###-#### >> Inspection requested via web by Craig Korell
2nd story floor and wall rough in ok cover
ELE13-01024 Final5/31/20136/3/20136/3/2013 9:59:35 AMPPASS
Contact is Jeff Hagen Phone #: ###-#### >> Inspection requested via web by Scott Campbell Final ok
ELE13-01383 Rough-In Permanent Service6/2/20136/3/20136/3/2013 9:45:43 AMAPASS
Phone #: ###-#### >> Inspection requested via web by TOM BICANDI
Rough in ok cover p/s u/g n ok
ELE13-00418 Electrical Rough-In5/31/20136/3/20136/3/2013 9:15:12 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Walls as noted on print rough in ok cover
ELE13-00236 Electrical Rough-In6/2/20136/3/20136/3/2013 8:47:01 AMAPASS
we will be on site from 7am to 9am 6/3/2013 Phone #: ###-#### >> Inspection requested via web by Karl Paige
Phase 2 wall rough in ok cover