ELE13-01109
| Final | 6/3/2013 | 6/3/2013 | 6/3/2013 4:35:16 PM | P | PASS |
|
|
corrections made and need ok from Idaho power to restore Phone #: ###-#### >> Inspection requested via web by Randy Fletcher Corrections made Final ok
|
ELE13-01109
| Permanent Service | 6/3/2013 | 6/3/2013 | 6/3/2013 4:34:32 PM | P | PASS |
|
|
corrections made and need ok from Idaho power to restore Phone #: ###-#### >> Inspection requested via web by Randy Fletcher p/s o/h rec ok
|
ELE12-00730
| Final | 6/3/2013 | 6/3/2013 | 6/3/2013 4:19:28 PM | P | FAIL |
|
|
Jeff Creek ###-#### Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek 1. Breakers in panel shall be same brand and listed for that manufacturer. 2. Spark rings shall be installed where box does not cover combustible material. 3. Boiler receptical shall be GFCI protected.
|
ELE11-01478
| Conference | 6/3/2013 | 6/3/2013 | 6/3/2013 3:38:49 PM | P | CANC |
|
|
Vance-Please call at least 30 mins prior Phone #: ###-#### Needed rough in inspection
|
ELE11-01478
| Electrical Rough-In | 6/3/2013 | 6/3/2013 | 6/3/2013 3:37:40 PM | P | PASS |
|
|
Vance-Please call at least 30 mins prior Phone #: ###-#### Master hall and bathroom rough in ok cover
|
ELE13-00225
| Final | 5/31/2013 | 6/3/2013 | 6/3/2013 3:12:43 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Zane Robertson Final ok
|
ELE13-00388
| Final | 6/3/2013 | 6/3/2013 | 6/3/2013 2:10:29 PM | P | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by Eric Brown Main level only. Final ok. Contractor to mark circuits for owners to ensure power left off to open boxes in basement
|
ELE13-00173
| Final | 6/3/2013 | 6/3/2013 | 6/3/2013 1:47:50 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by PAT MILLER Final ok
|
GCE13-00085
| GCE-Permanent Service | 6/3/2013 | 6/3/2013 | 6/3/2013 1:23:53 PM | A | PASS |
|
|
###-#### Dan p/s o/h n ok
|
ELE13-01027
| Electrical Rough-In | 6/1/2013 | 6/3/2013 | 6/3/2013 10:36:00 AM | A | PASS |
|
|
I will not be there until about 10:00am and I would like to be there to walk it with you. I hope that is not a problem. Phone #: ###-#### >> Inspection requested via web by Craig Korell 2nd story floor and wall rough in ok cover
|
ELE13-01024
| Final | 5/31/2013 | 6/3/2013 | 6/3/2013 9:59:35 AM | P | PASS |
|
|
Contact is Jeff Hagen Phone #: ###-#### >> Inspection requested via web by Scott Campbell Final ok
|
ELE13-01383
| Rough-In Permanent Service | 6/2/2013 | 6/3/2013 | 6/3/2013 9:45:43 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by TOM BICANDI Rough in ok cover p/s u/g n ok
|
ELE13-00418
| Electrical Rough-In | 5/31/2013 | 6/3/2013 | 6/3/2013 9:15:12 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Walls as noted on print rough in ok cover
|
ELE13-00236
| Electrical Rough-In | 6/2/2013 | 6/3/2013 | 6/3/2013 8:47:01 AM | A | PASS |
|
|
we will be on site from 7am to 9am 6/3/2013 Phone #: ###-#### >> Inspection requested via web by Karl Paige Phase 2 wall rough in ok cover
|