Inspections for the day of: Monday, June 3, 2013.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS13-00153 ESC-Conference6/3/20136/3/20136/4/2013 1:19:34 PMPDONE
Need to talk to management to find what the stock pile are going to be used for. Asked the grounds keeper to spray the stock pilesdown with water to prevent airborne dust.
ESC12-00364 General Inspection6/3/20136/3/20136/4/2013 11:30:54 AM PART
ESC13-00309 Site Preparation6/3/20136/3/20136/4/2013 8:09:03 AMPPASS
ESC13-00308 Site Preparation6/3/20136/3/20136/4/2013 8:08:54 AMPPASS
ESC13-00306 Site Preparation6/3/20136/3/20136/4/2013 8:08:45 AMPPASS
ESC13-00306 Site Preparation6/3/20136/3/20136/4/2013 8:08:35 AMPCANC
Duplicate
ESC13-00305 Complaint Inspection6/3/20136/3/20136/4/2013 8:08:08 AMPPASS
Construction employees are not using the area across from the development. Employees at the business across from the lot are utilizing it. Also the land is owned by ACHD.
ESC12-00533 Aging Inspection6/3/20136/3/20136/3/2013 2:41:30 PM NH
could not gain gain access to the backyard. Work could be complete. Could not reach the RP
ESC11-00844 Aging Inspection6/3/20136/3/20136/3/2013 2:39:39 PM PASS
ESC10-00926 Aging Inspection6/3/20136/3/20136/3/2013 1:54:19 PM DONE
ESC11-00469 Aging Inspection6/3/20136/3/20136/3/2013 11:31:05 AM PASS
ESC13-00478 Site Preparation6/3/20136/3/20136/3/2013 11:23:18 AMPPASS
Prior to conncrete placement, a concrete washout must be provided
ESC11-00743 Aging Inspection6/3/20136/3/20136/3/2013 10:46:26 AM PASS
ESC12-00562 General Inspection6/3/20136/3/20136/3/2013 10:33:54 AM DONE
permit finaled
ESC12-00562 DOC - Permit Finaled6/3/20136/3/20136/3/2013 10:33:12 AMPPASS
ESC13-00013 BMP Violation5/30/20136/3/20136/3/2013 10:24:22 AMAPASS
ESC12-01162 General Inspection6/3/20136/3/20136/3/2013 10:16:47 AM FAIL
Verbal to RP;
Maintain perimeter controls. Will re-inspect on 6/7/13
ESC12-01129 General Inspection6/3/20136/3/20136/3/2013 9:23:33 AM NR
ESC11-00543 General Inspection6/3/20136/3/20136/3/2013 9:23:03 AM PASS
ESC12-01051 General Inspection6/3/20136/3/20136/3/2013 8:53:42 AM PASS
ESC12-00977 General Inspection6/3/20136/3/20136/3/2013 8:53:26 AM PASS
ESC12-00661 General Inspection6/3/20136/3/20136/3/2013 8:53:08 AM DONE
Permit finaled
ESC12-00661 DOC - Permit Finaled6/3/20136/3/20136/3/2013 8:52:57 AMPPASS
ESC13-00292 BMP Violation5/31/20136/3/20136/3/2013 8:03:04 AMAFAIL
Verbal to RP;
Provide sediment controls along the south section of the project. Monitor the provided washout due to the small size of the washout. Will re-inspect on 6/5/2013.