FIR14-00531
| INSP-Sprinkler Rough-in | 6/3/2015 | 6/3/2015 | 6/3/2015 1:14:27 PM | P | PART |
|
|
Rough inspection of unit soffits for Tower #4, 4th and 5th floors, including units 400, 401, 402, 403, 404, 405, 500, 501, 502, 503, 504 and 505. All inspected OK - unit 502 needs sprinkler installed. Also soffits in trash rooms - Tower 2 floors 2 thru 5. OK to cover pipe in these areas
|