Inspections for the day of: Friday, June 3, 2016.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-00166 FIRE-Final Inspection6/3/20166/3/20166/3/2016 1:26:33 PMPFAIL
The exit sign has not been repaired, an emergency light in the new area is non-functional and the new door hardware is still not single action. The fire extinguisher is current with its inspection but will expire next month.
BLD16-00065 FIRE-Final Inspection6/3/20166/3/20166/3/2016 1:10:22 PMPFAIL
Mount the fire extinguisher as discussed, provide exit sign as shown on the city approved plans or get plan review approval to delete, provide ADA hardware (single action) on the double store front doors or get plan review approval to remain as-is or to delete hardware entirely.
FIR16-00282 INSP-Sprinkler Rough-in/Hydro6/2/20166/3/20166/3/2016 12:56:20 PMPPART
1st floor hydro test passed. 2nd and 3rd failed due to visible loss of pressure at the guage.
FIR15-00709 INSP-Sprinkler Rough-in6/3/20166/3/20166/3/2016 12:54:48 PMPPART
2nd floor rough to cover inspection for the hardlids in the corridor passed except for the very west end in front of the stairs where a pendant head is missing.
FIR15-00822 INSP-Final Inspection6/2/20166/3/20166/3/2016 12:15:45 PMACANC
Shilo has provided info on corrected gpm requirements that will need to be approved by Tim Frost for the forward flush
BLD15-01869 FIRE-Final Inspection6/2/20166/3/20166/3/2016 11:07:27 AMAPART
Temp 30 day Final - Quinton Phone #: ###-####
FIR16-00282 INSP-Sprinkler Rough-in6/2/20166/3/20166/3/2016 10:32:02 AMAPASS
Second floor piping is now ok to cover. Third floor piping can not be covered since the tenting inspection failed again. Riser room can not be covered until tenting is addressed
BLD16-01063 FIRE-Final Inspection6/3/20166/3/20166/3/2016 9:50:06 AMPPASS
life safety passed
FIR16-00347 INSP-Final Inspection6/2/20166/3/20166/3/2016 9:49:17 AMAPASS
Permit finaled