ELE19-01452
| Final | 6/3/2019 | 6/3/2019 | 6/3/2019 3:22:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall... ok to final
|
ELE19-01454
| Final | 6/3/2019 | 6/3/2019 | 6/3/2019 3:21:45 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
|
ELE18-03866
| Final | 5/31/2019 | 6/3/2019 | 6/3/2019 3:20:09 PM | P | PART |
|
|
Please call Mike Clover Phone #: ###-#### Inspection requested via web by Kevin Perez... temp occupency for wharehouse area, mezzane, and offices remaining-verify GFI protection breakroom and wharehouse/garage area, circuit labeling on outlets, main reception all, and elevator
|
ELE18-03866
| Electrical Rough-In | 6/3/2019 | 6/3/2019 | 6/3/2019 3:17:49 PM | P | PASS |
|
|
Please call Mike Clover Phone #: ###-#### Inspection requested via web by Kevin Perez... ok to cover front reception
|
ELE19-01712
| Permanent Service | 6/3/2019 | 6/3/2019 | 6/3/2019 2:01:05 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bryan Atkins... p/s new ok meter pack labelled
|
ELE16-00559
| ELE-Aging Inspection | 6/3/2019 | 6/3/2019 | 6/3/2019 1:39:39 PM | | FAIL |
|
|
contractor making no attempt to make corrections has been notified
|
ELE19-01220
| Final | 5/31/2019 | 6/3/2019 | 6/3/2019 1:30:16 PM | P | PASS |
|
|
electrician Duke phone # ###-#### Phone #: ###-#### Inspection requested via web by Matthew White... load verified by contractor, permit fees applied and paid, issue on other circuits rectified-issue with insta-hot
|
ELE15-02623
| DOC - Permit Expired | 6/3/2019 | 6/3/2019 | 6/3/2019 1:15:26 PM | P | PASS |
|
|
no activity on permit for over 180 days another permit required to finish work
|
ELE19-01989
| Permanent Service | 5/31/2019 | 6/3/2019 | 6/3/2019 1:07:04 PM | A | FAIL |
|
|
Door code is 2730. Power has been off for over one year. Customer wants to energize before starting on renovations. Phone #: ###-#### Inspection requested via web by Dylan Pierce... grounding shall be brought up to code...2nd ground rod added and hot/cold water pipes need bonding
|
ELE18-03476
| Electrical Rough-In | 5/31/2019 | 6/3/2019 | 6/3/2019 12:34:21 PM | A | PASS |
|
|
above ceiling - Zach Phone #: ###-####... Area 3 up to line 16 grid ok to cover
|
ELE19-02006
| Electrical Rough-In | 6/2/2019 | 6/3/2019 | 6/3/2019 10:13:00 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton... wall cover...zone A thru F excluding bath 303 and 343
|
ELE19-01890
| Electrical Rough-In | 6/2/2019 | 6/3/2019 | 6/3/2019 9:37:25 AM | A | PASS |
|
|
30 minute call ahead if needed to have foreman there. Daniel is foreman Phone #: ###-#### Inspection requested via web by Kerri Hamilton.. 2nd floor bathrooms only ok to cover LF side bath and shower area walls and hard lid excluding RT side bathroom...supports, grounding metal boxes, and junction boxes need addressed
|
ELE19-01916
| Electrical Rough-In | 6/1/2019 | 6/3/2019 | 6/3/2019 9:19:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Lauren Houck... ok to cover walls only junction boxes in attic need addressed before cover given island outlet needs future conference ...location, circuit requirement, and appliance use?
|
ELE19-01992
| Electrical Rough-In | 5/31/2019 | 6/3/2019 | 6/3/2019 8:31:21 AM | A | PASS |
|
|
new walls cover inspection second floor Phone #: ###-#### Inspection requested via web by David Feller....walls added creating new offices...rough walls only ok
|