Inspections for the day of: Monday, June 3, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03990 BLD-Wall Bracing5/31/20196/3/20196/4/2019 6:18:09 AMAPEND
Brian Phone #: ###-#### ok after spec inspection sign off
BLD17-03345 BLD-Framing/Rough-in6/3/20196/3/20196/4/2019 6:08:01 AMPPART
Jason Phone #: ###-####
BLD19-00472 BLD-Footing5/31/20196/3/20196/4/2019 6:07:20 AMAPASS
Robere Phone #: ###-####
BLD19-00278 BLD-Wall Bracing5/30/20196/3/20196/4/2019 6:07:05 AMPPASS
Interior sheer panel nailing and floor to floor straps for first floor of Area B. Al with MTI completed epoxy and hold down inspection for this area on 5/30. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD19-01069 BLD-Final5/31/20196/3/20196/3/2019 2:12:02 PMPPASS
Lora Phone #: ###-####
BLD18-02428 BLD-Framing/Rough-in6/3/20196/3/20196/3/2019 1:31:16 PMPDONE
george Phone #: ###-####
BLD18-02427 BLD-Framing/Rough-in6/3/20196/3/20196/3/2019 1:31:04 PMPDONE
george Phone #: ###-####
BLD18-02411 BLD-Final6/3/20196/3/20196/3/2019 1:29:06 PMPPEND
Tim- please call for access Phone #: ###-#### needs site plan and blower door test
BLD19-01263 BLD-Footing5/31/20196/3/20196/3/2019 9:04:13 AMAPASS
trying to pour at noon // Manny Phone #: ###-####
BLD19-00420 BLD-Wall Bracing5/31/20196/3/20196/3/2019 9:03:59 AMACANC
Manny Phone #: ###-####
BLD19-00420 BLD-Foundation6/3/20196/3/20196/3/2019 9:03:44 AMPPASS
BLD18-04302 BLD-Other6/2/20196/3/20196/3/2019 8:28:59 AMAPASS
Sheathing Inspection Phone #: ###-#### Inspection requested via web by Benjamin McLenna
BLD18-04302 BLD-Wall Bracing6/3/20196/3/20196/3/2019 8:28:41 AMPPASS