ELE20-01247
| Electrical Rough-In | 5/27/2020 | 6/3/2020 | 6/3/2020 2:54:20 PM | P | PASS |
|
|
This is for a power to panel inspection in order for Idaho Power to restore power. Please try and go around 1PM. We can do the midpoint/rough inspection at the same time. Phone #: ###-#### Inspection requested via web by Kilee Russell... UL listed equipment and grounding verified
|
ELE20-00750
| Electrical Rough-In | 6/3/2020 | 6/3/2020 | 6/3/2020 2:53:43 PM | P | PASS |
|
|
pole base inspection Phone #: ###-#### Inspection requested via web by Todd Hall... ok to pour
|
ELE19-04348
| Electrical Rough-In | 6/3/2020 | 6/3/2020 | 6/3/2020 2:35:21 PM | P | NR |
|
|
pole base inspection Phone #: ###-#### Inspection requested via web by Todd Hall.. installation not complete
|
ELE20-01247
| Conference | 5/27/2020 | 6/3/2020 | 6/3/2020 2:04:02 PM | P | CANC |
|
|
This is for a power to panel inspection in order for Idaho Power to restore power. Please try and go around 1PM. We can do the midpoint/rough inspection at the same time. Phone #: ###-#### Inspection requested via web by Kilee Russell...needed to be perm service inspection
|
ELE20-01247
| Permanent Service | 6/3/2020 | 6/3/2020 | 6/3/2020 2:03:32 PM | P | PASS |
|
|
This is for a power to panel inspection in order for Idaho Power to restore power. Please try and go around 1PM. We can do the midpoint/rough inspection at the same time. Phone #: ###-#### Inspection requested via web by Kilee Russell... adding 2 200A exterior disconnects for new solar baterry storage system p/s u/g reconnection ok
|
ELE20-01705
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 1:33:24 PM | P | PASS |
|
|
I am having another service finaled in Meridian, hopefully in the morning. I should be able to be there with a 30 minute call ahead. Thank you! Phone #: ###-#### Inspection requested via web by Shawn Case...ok to final
|
ELE20-01815
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 1:01:52 PM | P | CANC |
|
|
Please call Aric on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks...job not complete at time of inspection...issue with A/C circuit and service receptacle...will be recalled when done
|
ELE20-01815
| Electrical Rough-In | 6/3/2020 | 6/3/2020 | 6/3/2020 1:00:47 PM | P | PASS |
|
|
Please call Aric on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks...rough and trim of furnace in attic ok...disconnect, light and outlet installed...A/C circuit not complete-running new circuit 30A
|
ELE20-01644
| Final | 6/3/2020 | 6/3/2020 | 6/3/2020 12:17:48 PM | P | FAIL |
|
|
Chad Vanorden is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce...
1) abandoned electrical shall be completely removed and safed off...have box with connector installed and openings not sealed..Boise City ordinance 2) electrical junction, pull, and or splice boxes shall be accessible...314.29
|
ELE18-02206
| Final | 6/3/2020 | 6/3/2020 | 6/3/2020 11:17:18 AM | P | PASS |
|
|
service final...ok to final
|
ELE20-01852
| Permanent Service | 6/2/2020 | 6/3/2020 | 6/3/2020 11:01:35 AM | A | PASS |
|
|
Jose Phone #: ###-####... sevice changed from o/h to u/g new all-in-one...rehooked up existing circuits p/s u/g new ok
|
ELE19-04173
| Electrical Rough-In | 6/3/2020 | 6/3/2020 | 6/3/2020 10:55:46 AM | P | CANC |
|
|
inspection for pole bases also see pole base inspection scheduled for building 10 Phone #: ###-#### >> Inspection requested via web by Todd Hall Inspection cancelled from web by: Todd Hall
|
ELE20-00819
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 10:35:22 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
|
ELE20-00820
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 10:32:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
|
ELE20-00816
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 10:23:58 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
|
ELE20-00815
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 10:23:33 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
|
ELE20-01277
| Final | 6/3/2020 | 6/3/2020 | 6/3/2020 8:56:49 AM | A | PASS |
|
|
ok to final
|
ELE20-01114
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 8:56:26 AM | A | CANC |
|
|
Please call 30. mins prior Phone #: ###-#### Inspection requested via web by Kerri Hamilton.. wrong unit scheduled
|
ELE20-01873
| Rough-In Permanent Service | 6/2/2020 | 6/3/2020 | 6/3/2020 8:32:31 AM | A | PASS |
|
|
access 1027 Phone #: ###-#### Inspection requested via web by David Nelson... ok to cover new offices...access west side of building along Maple Grove Rd.
|
ELE20-01444
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 8:14:18 AM | A | FAIL |
|
|
the property is unoccupied. the garage front side door will be open at 7am. The foreman may not be at the site. but side door will be open. if any questions please call. thank you Phone #: ###-#### Inspection requested via web by Taras Shulga...
1) all 120V 15A/20A receptacles in a garage shall have GFCI protection
|
ELE19-04173
| Electrical Rough-In | 6/3/2020 | 6/3/2020 | 6/3/2020 12:00:00 AM | A | PASS |
|
|
pole base inspection Phone #: ###-#### Inspection requested via web by Todd Hall... ok to pour
|
ELE18-01222
| Final | 6/2/2020 | 6/3/2020 | 6/2/2020 1:32:22 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by cris flores Inspection cancelled from web by: cris flores
|
ELE20-01851
| Permanent Service | 6/1/2020 | 6/3/2020 | 6/1/2020 3:10:38 PM | P | CANC |
|
|
Jeff is the site contact. We would like to request an early afternoon. Thank you! Phone #: ###-#### >> Inspection requested via web by Stacie Tasker Inspection cancelled from web by: Stacie Tasker
|