BLD19-04980
| BLD-Concrete | 6/3/2020 | 6/3/2020 | 6/3/2020 4:39:48 PM | P | PART |
|
|
Gene *screened* Phone #: ###-####. 7 Panels ok pending special inspection.
|
BLD20-00350
| BLD-Final | 6/2/2020 | 6/3/2020 | 6/3/2020 3:15:53 PM | P | PASS |
|
|
Gene *screened* Phone #: ###-####. Ok for perm occ.
|
BLD20-01051
| BLD-Conference | 6/3/2020 | 6/3/2020 | 6/3/2020 2:38:50 PM | P | DONE |
|
|
|
BLD20-01133
| BLD-Framing/Rough-in | 5/27/2020 | 6/3/2020 | 6/3/2020 2:17:22 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kilee Russell. panel arrays installed as per plan. Per the engineers letter, no additional work was required to upgrade the existing roof.
|
BLD20-01620
| BLD-Footing | 6/3/2020 | 6/3/2020 | 6/3/2020 1:11:08 PM | P | PASS |
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD20-00300
| BLD-Final | 6/2/2020 | 6/3/2020 | 6/3/2020 12:05:11 PM | A | DONE |
|
|
Inspection requested via web by Danny Pardee
|
BLD20-00300
| DOC - Permit Finaled | 6/3/2020 | 6/3/2020 | 6/3/2020 12:05:05 PM | P | PASS |
|
|
|
BLD19-04673
| BLD-Final | 6/2/2020 | 6/3/2020 | 6/3/2020 12:04:41 PM | A | NR |
|
|
screened // John Phone #: ###-####. Needs to have overhead door removed from scope of work and plans. Also needs to resolve electrical permit requirement.
|
BLD18-01027
| BLD-Framing/Rough-in | 5/27/2020 | 6/3/2020 | 6/3/2020 12:03:46 PM | A | CANC |
|
|
|
MIS20-00181
| BLD-Conference | 6/2/2020 | 6/3/2020 | 6/3/2020 11:21:24 AM | A | FAIL |
|
|
CTR requested to be taken off project and void permit. Work possibly being done without permits. Phone #: ###-####. A correction notice was issued to obtain a building permit for the reapair work done on the west side of the building. The original contractor (CTR) did not end up performing the work.
|
BLD19-02021
| BLD-Final | 6/2/2020 | 6/3/2020 | 6/3/2020 10:33:14 AM | A | NR |
|
|
Call for access - Corey Phone #: ###-####. Needs to provide final letter from special inspection agency.
|
BLD20-00093
| BLD-Framing/Rough-in | 6/2/2020 | 6/3/2020 | 6/3/2020 10:32:39 AM | A | PASS |
|
|
steve Phone #: ###-####. ok to cover roof only.
|
BLD20-01671
| BLD-Final | 6/2/2020 | 6/3/2020 | 6/3/2020 10:03:33 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by vicky kester. Electrical and plumbing finals required first.
|
BLD19-04920
| BLD-Footing | 6/2/2020 | 6/3/2020 | 6/3/2020 10:02:22 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Todd Landvatter. Noted several areas with insufficient clearances and needs to clean out step footings areas.
|
BLD16-00818
| BLD-Concrete | 6/2/2020 | 6/3/2020 | 6/3/2020 9:35:01 AM | A | PASS |
|
|
Alex Phone #: ###-####. Framing for exterior concrete stairs.
|
BLD20-01626
| BLD-Footing | 6/3/2020 | 6/3/2020 | 6/3/2020 9:01:04 AM | A | CANC |
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell. Wrong permit called in.
|
BLD20-00209
| BLD-Footing | 6/2/2020 | 6/3/2020 | 6/3/2020 8:59:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John Saucerman. Perimeter footings ok. Will olaso hace special inspection.
|