ELE00-01098
| Electrical Rough-In | 6/29/2000 | 6/30/2000 | 6/30/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/29/2000 at 08:46:20. Contact: ###-####.
|
ELE00-02176
| Final | 6/29/2000 | 6/30/2000 | 6/30/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/29/2000 at 11:42:14. Contact: ###-####.
|
ELE00-02477
| Rough-In Permanent Service | 6/29/2000 | 6/30/2000 | 6/30/2000 12:00:00 AM | A | PASS |
|
|
Dave ###-####
|
ELE00-02478
| Final | 6/29/2000 | 6/30/2000 | 6/30/2000 12:00:00 AM | A | PASS |
|
|
hot tub ###-#### Tammy call to meet there for access
|
ELE00-02324
| Rough-In Permanent Service | 6/29/2000 | 6/30/2000 | 6/30/2000 12:00:00 AM | A | FAIL |
|
|
reinspection bill ###-#### Dave St George will fax statement that Id power is satisified that the mast will hold the load 6/30/00 4:55:57 PM
|
ELE00-01922
| Final | 6/29/2000 | 6/30/2000 | 6/30/2000 12:00:00 AM | A | PART |
|
|
dan ###-#### Partial Only to occupy 1671 only othere require inspection check insta hot and whole house fan in 1671 when next called 6/30/00 4:54:01 PM
|
ELE00-02482
| Permanent Service | 6/29/2000 | 6/30/2000 | 6/30/2000 12:00:00 AM | A | PASS |
|
|
A-1 Electric ###-####
|
ELE00-02032
| Final | 6/29/2000 | 6/30/2000 | 6/30/2000 12:00:00 AM | P | PART |
|
|
###-####
|
ELE00-02484
| Electrical Rough-In | 6/29/2000 | 6/30/2000 | 6/30/2000 12:00:00 AM | P | FAIL |
|
|
Marv ###-#### Was not ready 6/30/00 4:57:06 PM
|
ELE00-02486
| Temporary Service | 6/30/2000 | 6/30/2000 | 6/30/2000 12:00:00 AM | P | PASS |
|
|
jason ###-####
|
ELE00-01246
| Electrical Rough-In | 6/30/2000 | 6/30/2000 | 6/30/2000 12:00:00 AM | P | NR |
|
|
wall cover ###-####
|
ELE00-02499
| Permanent Service | 6/30/2000 | 6/30/2000 | 6/30/2000 12:00:00 AM | P | NR |
|
|
###-####
|