Inspections for the day of: Friday, June 30, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01857 BLD-Footing6/29/20006/30/20006/30/2000 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 06/29/2000 at 16:07:01. Contact: ###-####. by contractor 6/30/00 3:29:22 PM
BLD00-01080 BLD-Final6/29/20006/30/20006/30/2000 12:00:00 AMAFAIL
###-#### not ready no elec final 6/30/00 3:24:57 PM
BLD00-01141 BLD-Final6/29/20006/30/20006/30/2000 12:00:00 AMAFAIL
###-#### not ready elec c/n 6/30/00 3:24:09 PM
BLD00-01718 BLD-Framing/Rough-in6/29/20006/30/20006/30/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/29/2000 at 20:42:43. Contact: ###-####.
BLD00-01779 BLD-Footing6/29/20006/30/20006/30/2000 12:00:00 AMAPART
around 9:00 marshall williams ###-#### early start okay e-start aok 6/30/00 3:23:47 PM
BLD00-01885 BLD-Footing6/29/20006/30/20006/30/2000 12:00:00 AMPPASS
larry ###-####
BLD00-01169 BLD-Framing/Rough-in6/29/20006/30/20006/30/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/29/2000 at 13:59:16. Contact: .
BLD00-01142 BLD-Final6/30/20006/30/20006/30/2000 12:00:00 AMPFAIL
tim 1-###-#### c/n posted 7/3/00 8:46:57 AM
BLD00-01586 BLD-Framing/Rough-in6/30/20006/30/20006/30/2000 12:00:00 AMPPASS
tim 1-208-*###-#### E/code c/n posted 7/3/00 8:47:33 AM
BLD00-01627 BLD-Footing6/30/20006/30/20006/30/2000 12:00:00 AMPPASS
frank ###-####
MEC00-01906 Final6/30/20006/30/20006/30/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/30/2000 at 09:13:20. Contact: ###-####.
BLD00-00684 BLD-Framing/Rough-in6/30/20006/30/20006/30/2000 12:00:00 AMPPART
shear wall wade ###-#### ok to side 7/3/00 8:46:44 AM