ESC04-00011
| Tracking Control | 6/30/2004 | 6/30/2004 | 6/30/2004 12:00:00 AM | A | FAIL |
|
|
Excessive trackout from job site. Discussed with RP and Super, sweeper on the way. Recommended that the construction entrances be expanded. Sweep daily or as needed. 6/30/2004 8:08:30 AM
|
ESC03-01278
| Site Preparation | 6/30/2004 | 6/30/2004 | 6/30/2004 12:00:00 AM | A | PART |
|
|
Notice to rp to maintain the straw wattle, remove sediment and position stakes closer together. Remove sediment from sidewalk and street. Will follow up. 6/30/2004 1:22:08 PM
|
ESC04-00466
| Site Preparation | 6/30/2004 | 6/30/2004 | 6/30/2004 12:00:00 AM | A | PART |
|
|
Sweep daily or as needed. 6/30/2004 1:22:45 PM
|
ESC04-00733
| Conference | 6/30/2004 | 6/30/2004 | 6/30/2004 12:00:00 AM | P | PART |
|
|
Mud on street Correction to rp, Clean up and maintain bmp's to reduce sediment if rain events are such. 6/30/2004 12:54:09 PM
|
ESC03-01106
| Tracking Control | 6/30/2004 | 6/30/2004 | 6/30/2004 12:00:00 AM | P | FAIL |
|
|
Mud/dirt and concrete trackout from construction site. Issued correction to RP. Sweep all hardsurfaces and install gravel at construction entrances. 6/30/2004 1:49:53 PM
|