FIR02-00290
| INSP-Conference | 6/16/2005 | 6/30/2005 | 6/30/2005 4:15:27 PM | P | NR |
|
|
Phil left message that he would followup for final
|
BLD04-01721
| FIRE-Final Inspection | 6/30/2005 | 6/30/2005 | 6/30/2005 4:00:07 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 6/30/2005 at 9:23:38 AM. Contact: ###-####.
|
BLD03-03021
| FIRE-Final Inspection | 6/29/2005 | 6/30/2005 | 6/30/2005 3:35:54 PM | P | PASS |
|
|
Fire life safety finaled
|
FIR05-00342
| INSP-Sprinkler Rough-in | 6/30/2005 | 6/30/2005 | 6/30/2005 3:18:15 PM | P | PASS |
|
|
fire sprinklers finaled
|
FIR04-00531
| INSP-Sprinkler Rough-in/Hydro | 6/29/2005 | 6/30/2005 | 6/30/2005 3:16:57 PM | P | PASS |
|
|
Hydro test for dry system #1 and #2 overhead systems and the two east branchlines under the canopy passed.
|
FIR05-00361
| INSP-Final Inspection | 6/30/2005 | 6/30/2005 | 6/30/2005 2:14:59 PM | P | PASS |
|
|
Fire sprinkler finaled
|
FIR05-00217
| INSP-Sprinkler Rough-in/Hydro | 6/29/2005 | 6/30/2005 | 6/30/2005 12:16:00 PM | P | PASS |
|
|
24 hour air test passed on dry system
|
FIR05-00184
| FIR-Aging Inspection | 6/30/2005 | 6/30/2005 | 6/30/2005 10:24:57 AM | | NR |
|
|
work is in progress, waiting on appliances
|
FIR04-00258
| INSP-Sprinkler Rough-in/Hydro | 6/28/2005 | 6/30/2005 | 6/30/2005 9:59:17 AM | A | PASS |
|
|
Above ground hydro test and underground flush passed.
|
FIR05-00095
| INSP-Final Inspection | 6/28/2005 | 6/30/2005 | 6/30/2005 9:32:40 AM | A | PASS |
|
|
Permit finaled. Underground flush passed
|