MEC06-02140
| Final | 6/30/2006 | 6/30/2006 | 7/1/2006 10:55:20 AM | P | PEND |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..this should have been a r/i and gas test...i rescheduled this for mon am
|
MEC06-02097
| Rough-in | 6/30/2006 | 6/30/2006 | 7/1/2006 10:54:39 AM | P | NR |
|
|
Phone #: ###-#### Internet Inspection Request from: Angie Thome..out of time..i called contractor and i rescheduled this for mon am
|
MEC06-02016
| Rough-in | 6/29/2006 | 6/30/2006 | 7/1/2006 10:53:55 AM | A | NR |
|
|
Please do gas pressure witness test with mechanical rough in inspection. Please also do outdoor fireplace inspection. Please note that the inside fireplace we did not install, we only installed the fireplace outside. Thanks.; Phone #: ###-#### Internet Inspection Request from: Donnette Ellis..out of time..called donette and i rescheduled for mon
|
MEC06-01711
| Final | 6/23/2006 | 6/30/2006 | 7/1/2006 10:52:17 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: loretta barck..need comb air
|
MEC06-02169
| Final | 6/29/2006 | 6/30/2006 | 6/30/2006 3:40:34 PM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Frank Marturello
|
MEC06-01754
| Final | 6/30/2006 | 6/30/2006 | 6/30/2006 2:16:05 PM | A | FAIL |
|
|
Call prior to inspector arriving at the site, so we are able to let him/her into the site.; Phone #: ###-#### James Internet Inspection Request from: Donovan ..Waldenmyer...posted corrections
|
MEC06-02153
| Rough-in | 6/29/2006 | 6/30/2006 | 6/30/2006 2:14:35 PM | A | NH |
|
|
Scheduled by a contractor via Hello! on 6/29/2006 at 9:56:55 PM. Contact: call 1/2 hr prior Karen at###-####.
|
MEC06-01908
| Conference | 6/30/2006 | 6/30/2006 | 6/30/2006 11:30:34 AM | A | PASS |
|
|
karl..met with g/c and karl to discuss job..need to re-test gas line ( leak), need manuf specs on w/h venting and told g/c to watch his clearance from range to side and any overhead cabinets ( combustibles ).
|
MEC06-01998
| Rough-in | 6/28/2006 | 6/30/2006 | 6/30/2006 11:28:14 AM | A | PART |
|
|
Inspection for radiant floor heat. Concrete is scheduled for 11:00, please advise if inspection cannot be completed before the pour. Thanks Dixie! ; Phone #: ..test###-#### Internet Inspection ...Request from: Jim Ritter..test on loop ok
|
MEC06-01135
| Final | 6/30/2006 | 6/30/2006 | 6/30/2006 11:09:56 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/30/2006 at 6:09:14 AM. Contact: ###-####....2 s/f dampers ok
|
MEC05-04035
| Final | 6/29/2006 | 6/30/2006 | 6/30/2006 11:09:22 AM | A | PASS |
|
|
On site contact Chase @ ###-####. Job# 571; Phone #: ###-#### Internet Inspection Request from: SUE OGLESBY
|
MEC05-04038
| Rough-in | 6/30/2006 | 6/30/2006 | 6/30/2006 11:09:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 6/30/2006 at 6:08:27 AM. Contact: ###-####...ok to cover
|
MEC06-01908
| Rough-in | 6/29/2006 | 6/30/2006 | 6/30/2006 10:16:44 AM | A | PEND |
|
|
karl; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..i rescheduled this as a conference
|
MEC06-00530
| Final | 6/28/2006 | 6/30/2006 | 6/29/2006 10:42:34 AM | A | CANC |
|
|
On Site Contact is Chase @ ###-####. Job# 574; Phone #: ###-#### Internet Inspection Request from: SUE OGLESBY Inspection cancelled from web by: Dixie Miyake
|