BLD05-02319
| BLD-Final | 6/30/2006 | 6/30/2006 | 6/30/2006 4:48:34 PM | P | PASS |
|
|
Drawings & sign off card will be on desk by popcorn machine///dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chile. ok for perm occ. can not verify code enforcement or public works finals.
|
BLD05-03012
| BLD-Final | 6/30/2006 | 6/30/2006 | 6/30/2006 4:33:25 PM | P | NR |
|
|
Internet Inspection Request from: Carey Allen
|
BLD05-03330
| BLD-Framing/Rough-in | 6/30/2006 | 6/30/2006 | 6/30/2006 4:27:19 PM | P | NR |
|
|
Internet Inspection Request from: Carey Allen
|
BLD05-03203
| BLD-Final | 6/30/2006 | 6/30/2006 | 6/30/2006 4:14:43 PM | P | PASS |
|
|
Internet Inspection Request from: Carey Allen
|
BLD05-03203
| DOC - Permit Finaled | 6/30/2006 | 6/30/2006 | 6/30/2006 4:14:31 PM | P | PASS |
|
|
|
BLD05-03329
| BLD-Framing/Rough-in | 6/30/2006 | 6/30/2006 | 6/30/2006 4:06:23 PM | P | PASS |
|
|
Internet Inspection Request from: Carey Allen. pending mech.
|
BLD05-02912
| BLD-Final | 6/30/2006 | 6/30/2006 | 6/30/2006 4:00:45 PM | P | NR |
|
|
Internet Inspection Request from: Carey Allen. Needs plumbing final
|
BLD06-00482
| BLD-Framing/Rough-in | 6/29/2006 | 6/30/2006 | 6/30/2006 3:11:10 PM | P | PASS |
|
|
Trudy; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD06-01168
| BLD-Framing/Rough-in | 6/30/2006 | 6/30/2006 | 6/30/2006 2:41:12 PM | P | PASS |
|
|
russ Note: call 1/2 hr prior; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD05-02854
| BLD-Final | 6/30/2006 | 6/30/2006 | 6/30/2006 2:30:52 PM | P | PASS |
|
|
ben ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Vanilla finish ok.
|
BLD05-02651
| BLD-Foundation | 6/30/2006 | 6/30/2006 | 6/30/2006 2:12:56 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 6/30/2006 at 9:24:36 AM. Contact: ###-####.
|
BLD05-02526
| BLD-Final | 6/29/2006 | 6/30/2006 | 6/30/2006 11:15:14 AM | A | FAIL |
|
|
PAUL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Landing at main door not 36 inches in direction of travel. c/n posted.
|
BLD06-00991
| BLD-Footing | 6/29/2006 | 6/30/2006 | 6/30/2006 10:56:04 AM | A | PASS |
|
|
greg ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD06-00824
| BLD-Footing | 6/29/2006 | 6/30/2006 | 6/30/2006 10:41:58 AM | A | PASS |
|
|
paul - 11 am pour; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Perimeter footings and center footing. Did note that special insp. is being performed.
|
BLD05-02760
| BLD-Final | 6/28/2006 | 6/30/2006 | 6/30/2006 10:09:11 AM | A | FAIL |
|
|
Chris ###-####//call for access info. Install address numbers. complete grading. Install smokeseal on door from R to U occ.c/n posted.
|
BLD05-02761
| BLD-Final | 6/28/2006 | 6/30/2006 | 6/30/2006 10:06:00 AM | A | FAIL |
|
|
Chris ###-####//call for access . Needs to complete grading. c/n posted.
|
BLD04-02464
| BLD-Other | 6/30/2006 | 6/30/2006 | 6/30/2006 9:40:15 AM | A | PASS |
|
|
Demo (phase 1) complete. Verify removal of 16K + sq .ft structure. Bldg. has been demoed and removed. Hole is to be backfilled. Did note some on site material with excessive const. debri making this fill unsuitable for backfill. GC was notified and also left message with jobsite super and contacted special insp. agency.
|
BLD06-01078
| BLD-Framing/Rough-in | 6/29/2006 | 6/30/2006 | 6/30/2006 9:20:26 AM | A | PASS |
|
|
eli; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. New front and verified the fire tape was completed on back side.
|