Inspections for the day of: Wednesday, June 30, 2010.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC10-01955 Pressure Test6/30/20106/30/20107/1/2010 8:57:01 AMPPASS
LOCK BOX 3020 Inspection requested from web by: Bill Burch Phone #: ###-#### ri 20# test ok
MEC10-01955 Rough-in6/30/20106/30/20107/1/2010 8:56:40 AMPPASS
LOCK BOX 3020 Inspection requested from web by: Bill Burch Phone #: ###-#### ri 20# test ok
PLM10-01490 Water and/or Sewer6/30/20106/30/20106/30/2010 3:14:25 PMPPASS
chad Phone #: ###-####
PLM10-01490 Final6/30/20106/30/20106/30/2010 3:14:06 PMPPASS
chad Phone #: ###-####
PLM10-01188 Plumbing Rough-in6/30/20106/30/20106/30/2010 3:07:11 PMPPASS
PLM10-01480 Plumbing Rough-in6/30/20106/30/20106/30/2010 2:48:27 PMPPASS
Raul Phone #: ###-#### ri ok they e-mailed me the revised plumbing plan.
PLM10-01461 Sprinkler (Final)6/29/20106/30/20106/30/2010 2:29:32 PMPFAIL
Matt Phone #: ###-#### 160 poly upstream of backflow preventer. worm drive clamps required at joints. R.P. must be installed 12" min. above grade or change to dcva. leave upstream piping exposed for inspection. have backflow preventer tested. left notice no answer at phone number.
PLM10-01314 Plumbing Rough-in6/30/20106/30/20106/30/2010 2:24:20 PMPPART
20# GAS TEST OK
PLM10-01188 Final6/29/20106/30/20106/30/2010 9:07:21 AMAFAIL
doan Phone #: ###-#### needs to vent kitchen sink and lav
PLM10-01486 Plumbing Rough-in6/29/20106/30/20106/30/2010 8:49:43 AMAPASS
Inspection requested from web by: Jason Gonzalez Phone #: ###-#### ri ok
PLM10-01460 Water and/or Sewer6/30/20106/30/20106/30/2010 8:36:22 AMAPASS
Inspection requested from web by: Scott Wickstrom Phone #: ###-#### water service ok needs foundation sealed and pvb tested