BLD10-01103
| FIRE-Conference | 6/28/2010 | 6/28/2010 | | P | |
|
|
Jim Phone #: ###-#### or Mike ###-####
|
FIR10-00089
| INSP-Sprinkler Rough-in | 6/30/2010 | 6/30/2010 | 6/30/2010 5:10:02 PM | P | FAIL |
|
|
Missing one lateral seismic brace at the south end of the dry system main, shadowing at one office area, welded 2" outlets on the dry system mains serving branchlines at the exterior canopy at some locations are not properly graded, noted one dry pendent at the main entry has been added. See stamped plans for annotations.
|
FIR10-00205
| INSP-Final Inspection | 6/30/2010 | 6/30/2010 | 6/30/2010 5:03:11 PM | P | PASS |
|
|
Fire alarm work passed field testing, permit final approved.
|
BLD10-00664
| FIRE-Final Inspection | 6/29/2010 | 6/30/2010 | 6/30/2010 5:02:10 PM | A | NR |
|
|
Work in progress, construction and finishes underway.
|
FIR10-00209
| INSP-Alarm Testing | 6/29/2010 | 6/30/2010 | 6/30/2010 5:00:39 PM | A | PART |
|
|
Completed notification appliance testing only for the remodel area. Duct detectors are not yet installed.
|
FIR10-00089
| INSP-Sprinkler Rough-in/Hydro | 6/29/2010 | 6/30/2010 | 6/30/2010 4:58:31 PM | A | PART |
|
|
Overhead hydrostatic test for both the wet and dry systems completed satisfactory.
|