FIR11-00159
| INSP-Sprinkler Rough-in | 6/29/2011 | 6/30/2011 | 7/1/2011 4:17:43 AM | P | FAIL |
|
|
Piping was not complete in Jewelry area when I stopped at 2:00pm. Rescheduled for tomorrow.
|
BLD11-01386
| FIRE-Final Inspection | 6/30/2011 | 6/30/2011 | 6/30/2011 4:25:26 PM | P | FAIL |
|
|
See the city approved plans for corrections marked in red. They include a floor plan that does not match, no fire extinguisher and door hardware issues.
|
FIR10-00556
| INSP-Sprinkler Rough-in | 6/29/2011 | 6/30/2011 | 6/30/2011 4:24:13 PM | A | PASS |
|
|
The last phase of the sprinkler piping can be covered. A final inspection can be called in when all of the ceiling tile has been installed.
|