ELE12-02505
| ELE-Aging Inspection | 6/30/2014 | 6/30/2014 | 6/30/2014 3:02:40 PM | | FAIL |
|
|
NEC 110.3(B) Signs are required to label with listing tag and disconnecting means
|
ELE14-01705
| Electrical Rough-In | 6/30/2014 | 6/30/2014 | 6/30/2014 2:40:50 PM | P | PASS |
|
|
Shane Phone #: ###-#### Rough-in ok cover, Main breaker required in remote panel of detacted shop
|
ELE14-01312
| Permanent Service | 6/30/2014 | 6/30/2014 | 6/30/2014 2:10:40 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by steve sellers p/s u/g rec ok GC will make visual access for service conduit to detact garage in three locations at time of garage r/i
|
ELE14-01437
| Final | 6/25/2014 | 6/30/2014 | 6/30/2014 1:36:23 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Neal Rumsey final ok
|
ELE14-01653
| Rough-In Permanent Service | 6/30/2014 | 6/30/2014 | 6/30/2014 1:26:48 PM | P | FAIL |
|
|
Abraham (GC will be on site Ken Williams ###-####) Phone #: ###-#### Install nail plate as per manufactures requirements. NEC 334.30 Shall staple NM cable within 12 in. of device boxes. NEC 314.29 Junction boxes shall be install so that the wiring contained in them can be rendered accessible without removing any part of the building. Complete make ups inside device boxes.
|
ELE14-01635
| Final | 6/30/2014 | 6/30/2014 | 6/30/2014 12:38:18 PM | P | PASS |
|
|
re inspection of heat pump any questions call Andy @ ###-#### Phone #: ###-#### >> Inspection requested via web by Andy Rose final ok
|
ELE14-01635
| Electrical Rough-In | 6/30/2014 | 6/30/2014 | 6/30/2014 12:37:55 PM | P | PASS |
|
|
re inspection of heat pump any questions call Andy @ ###-#### Phone #: ###-#### >> Inspection requested via web by Andy Rose Correction done, rough-in ok
|
ELE14-01715
| Rough-In Permanent Service | 6/29/2014 | 6/30/2014 | 6/30/2014 11:16:28 AM | A | PASS |
|
|
Call Dene with any questions Thank you Phone #: ###-#### >> Inspection requested via web by kim grundhauser rough-in p/s u/g n ok
|
ELE14-01685
| Rough-In Permanent Service | 6/25/2014 | 6/30/2014 | 6/30/2014 10:43:39 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Alan Lusk rough-in p/s u/g n ok
|
GCE14-00097
| GCE-Final | 6/27/2014 | 6/30/2014 | 6/30/2014 10:16:29 AM | A | NR |
|
|
Not ready, Incorrect inspection request for permanent service, reschedule with Garden City
|
GCE14-00098
| GCE-Rough-In | 6/27/2014 | 6/30/2014 | 6/30/2014 9:39:48 AM | A | PASS |
|
|
Greg ###-#### Breakroom area Rough-in ok cover walls
|
ELE13-02576
| Final | 6/26/2014 | 6/30/2014 | 6/30/2014 9:14:05 AM | A | PASS |
|
|
We are requesting a final inspection for HP B8 Chiller project for Monday, June 30th in the am. Our onsite contact is Rich 208.412.6019. Thank you Phone #: ###-#### >> Inspection requested via web by Clint Tate job complete, final ok
|
ELE12-01934
| Final | 6/27/2014 | 6/30/2014 | 6/30/2014 8:54:58 AM | A | FAIL |
|
|
>> Inspection requested via web by steve ragan Hyatt Hidden lakes Reserve No access, panel door paddle locked. No contact phone number
|