PLM15-01956
| Water Heater Final | 6/29/2015 | 6/30/2015 | 6/30/2015 4:12:50 PM | P | PASS |
|
|
fixed the 2 problems that were a problem thanks Phone #: ###-#### Inspection requested via web by brandon winkler
|
PLM15-02123
| Water and/or Sewer | 6/30/2015 | 6/30/2015 | 6/30/2015 3:48:13 PM | P | NR |
|
|
208 869 9311 JOHN Phone #: ###-#### Inspection requested via web by Mike Van Artsdalen==not ready, change sewer stub from test wye to connection point for modular to pvc dwv SCH 40, fill to top with water.
|
PLM15-02179
| Sprinkler (Final) | 6/30/2015 | 6/30/2015 | 6/30/2015 3:10:20 PM | P | PASS |
|
|
Sprinkle PVB ok
|
PLM15-02179
| Final | 6/30/2015 | 6/30/2015 | 6/30/2015 3:05:16 PM | P | CANC |
|
|
customer will be home after 1pm thanks Inspection requested via web by niall magill
|
PLM15-01770
| Final | 6/30/2015 | 6/30/2015 | 6/30/2015 2:53:25 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by bob pond===Need WH working to ensure 110 degree water or less to lavs, need water @ DF.
|
PLM15-01492
| Plumbing Rough-in | 6/29/2015 | 6/30/2015 | 6/30/2015 2:33:58 PM | P | PASS |
|
|
if questions call Brandon @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM15-00729
| Water Heater Final | 6/30/2015 | 6/30/2015 | 6/30/2015 2:17:42 PM | P | PART |
|
|
water heater @ Sharis Restaurant====WH ok, all backflow devices need to have current certification before permit can be finaled. schedule inspection when completed.
|
PLM15-00729
| Final | 6/30/2015 | 6/30/2015 | 6/30/2015 2:10:32 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Ben Davis====changed to WH final
|
PLM15-01371
| Groundwork | 6/29/2015 | 6/30/2015 | 6/30/2015 2:10:15 PM | P | PART |
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER===partial inspection on DWV GW in service bay, ok
|
PLM15-02166
| Sprinkler (Final) | 6/30/2015 | 6/30/2015 | 6/30/2015 12:34:52 PM | P | PASS |
|
|
DCVA in crawl certified
|
PLM15-02082
| Final | 6/24/2015 | 6/30/2015 | 6/30/2015 11:35:16 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette==changed to water heater final inspection.
|
PLM15-02082
| Water Heater Final | 6/30/2015 | 6/30/2015 | 6/30/2015 11:33:01 AM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette====plumber needs to provide access to water heater located behind panel sealed with screws,
|
PLM15-00729
| Water and/or Sewer | 6/30/2015 | 6/30/2015 | 6/30/2015 11:27:18 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Ben Davis Inspection cancelled from web by: Ben Davis
|
PLM15-02173
| Water and/or Sewer | 6/29/2015 | 6/30/2015 | 6/30/2015 11:23:30 AM | A | CANC |
|
|
Backflow device and main and drain are located on west side of house. Phone #: ###-#### Inspection requested via web by Kurt Hartley====changed inspectin to sprinkler final
|
PLM15-02173
| Sprinkler (Final) | 6/30/2015 | 6/30/2015 | 6/30/2015 11:21:15 AM | P | PART |
|
|
Backflow device and main and drain are located on west side of house. Phone #: ###-#### Inspection requested via web by Kurt Hartley=======BF needs to be certified before permit can be finaled, ok to bury, call for re inspect when completed.
|
PLM15-02176
| DOC - Permit Finaled | 6/30/2015 | 6/30/2015 | 6/30/2015 10:50:07 AM | P | PASS |
|
|
|
PLM15-02176
| Water and/or Sewer | 6/29/2015 | 6/30/2015 | 6/30/2015 10:49:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brett Simmons
|
PLM15-02168
| DOC - Permit Finaled | 6/30/2015 | 6/30/2015 | 6/30/2015 10:27:55 AM | P | PASS |
|
|
|
PLM15-02168
| Water and/or Sewer | 6/29/2015 | 6/30/2015 | 6/30/2015 10:25:45 AM | A | PASS |
|
|
Please calm bill with any questions ###-#### Phone #: ###-#### Inspection requested via web by Bill Kirk
|
PLM15-01771
| Final | 6/29/2015 | 6/30/2015 | 6/30/2015 10:12:08 AM | A | PASS |
|
|
if questions call Chad @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann====
|
PLM15-02167
| Water and/or Sewer | 6/29/2015 | 6/30/2015 | 6/30/2015 9:51:32 AM | A | FAIL |
|
|
Water and Sewer Line Inspection Phone #: ###-#### Inspection requested via web by Vicki Tallent====1) No test on water. 2) need tracer wire on water. 3) cannot embed water line directly in concrete. 4) Sewer test under 5psi
|
PLM15-01999
| Sprinkler (Final) | 6/29/2015 | 6/30/2015 | 6/30/2015 9:28:28 AM | A | FAIL |
|
|
Ryan Phone #: ###-####=====1)Cannot have cappped of opening upstream of RP, this creates a potential for a cross connection. 2) bottom of RP must be 12" minimum above ground. 3) adjust BV handle so it will open fully.
|