Inspections for the day of: Tuesday, June 30, 2015.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Little
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM15-01956 Water Heater Final6/29/20156/30/20156/30/2015 4:12:50 PMPPASS
fixed the 2 problems that were a problem thanks Phone #: ###-#### Inspection requested via web by brandon winkler
PLM15-02123 Water and/or Sewer6/30/20156/30/20156/30/2015 3:48:13 PMPNR
208 869 9311 JOHN Phone #: ###-#### Inspection requested via web by Mike Van Artsdalen==not ready, change sewer stub from test wye to connection point for modular to pvc dwv SCH 40, fill to top with water.
PLM15-02179 Sprinkler (Final)6/30/20156/30/20156/30/2015 3:10:20 PMPPASS
Sprinkle PVB ok
PLM15-02179 Final6/30/20156/30/20156/30/2015 3:05:16 PMPCANC
customer will be home after 1pm thanks Inspection requested via web by niall magill
PLM15-01770 Final6/30/20156/30/20156/30/2015 2:53:25 PMPFAIL
Phone #: ###-#### Inspection requested via web by bob pond===Need WH working to ensure 110 degree water or less to lavs, need water @ DF.
PLM15-01492 Plumbing Rough-in6/29/20156/30/20156/30/2015 2:33:58 PMPPASS
if questions call Brandon @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
PLM15-00729 Water Heater Final6/30/20156/30/20156/30/2015 2:17:42 PMPPART
water heater @ Sharis Restaurant====WH ok, all backflow devices need to have current certification before permit can be finaled. schedule inspection when completed.
PLM15-00729 Final6/30/20156/30/20156/30/2015 2:10:32 PMPCANC
Phone #: ###-#### Inspection requested via web by Ben Davis====changed to WH final
PLM15-01371 Groundwork6/29/20156/30/20156/30/2015 2:10:15 PMPPART
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER===partial inspection on DWV GW in service bay, ok
PLM15-02166 Sprinkler (Final)6/30/20156/30/20156/30/2015 12:34:52 PMPPASS
DCVA in crawl certified
PLM15-02082 Final6/24/20156/30/20156/30/2015 11:35:16 AMACANC
Phone #: ###-#### Inspection requested via web by Mary LaFayette==changed to water heater final inspection.
PLM15-02082 Water Heater Final6/30/20156/30/20156/30/2015 11:33:01 AMPFAIL
Phone #: ###-#### Inspection requested via web by Mary LaFayette====plumber needs to provide access to water heater located behind panel sealed with screws,
PLM15-00729 Water and/or Sewer6/30/20156/30/20156/30/2015 11:27:18 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Ben Davis Inspection cancelled from web by: Ben Davis
PLM15-02173 Water and/or Sewer6/29/20156/30/20156/30/2015 11:23:30 AMACANC
Backflow device and main and drain are located on west side of house. Phone #: ###-#### Inspection requested via web by Kurt Hartley====changed inspectin to sprinkler final
PLM15-02173 Sprinkler (Final)6/30/20156/30/20156/30/2015 11:21:15 AMPPART
Backflow device and main and drain are located on west side of house. Phone #: ###-#### Inspection requested via web by Kurt Hartley=======BF needs to be certified before permit can be finaled, ok to bury, call for re inspect when completed.
PLM15-02176 DOC - Permit Finaled6/30/20156/30/20156/30/2015 10:50:07 AMPPASS
PLM15-02176 Water and/or Sewer6/29/20156/30/20156/30/2015 10:49:17 AMAPASS
Phone #: ###-#### Inspection requested via web by Brett Simmons
PLM15-02168 DOC - Permit Finaled6/30/20156/30/20156/30/2015 10:27:55 AMPPASS
PLM15-02168 Water and/or Sewer6/29/20156/30/20156/30/2015 10:25:45 AMAPASS
Please calm bill with any questions ###-#### Phone #: ###-#### Inspection requested via web by Bill Kirk
PLM15-01771 Final6/29/20156/30/20156/30/2015 10:12:08 AMAPASS
if questions call Chad @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann====
PLM15-02167 Water and/or Sewer6/29/20156/30/20156/30/2015 9:51:32 AMAFAIL
Water and Sewer Line Inspection Phone #: ###-#### Inspection requested via web by Vicki Tallent====1) No test on water. 2) need tracer wire on water. 3) cannot embed water line directly in concrete. 4) Sewer test under 5psi
PLM15-01999 Sprinkler (Final)6/29/20156/30/20156/30/2015 9:28:28 AMAFAIL
Ryan Phone #: ###-####=====1)Cannot have cappped of opening upstream of RP, this creates a potential for a cross connection. 2) bottom of RP must be 12" minimum above ground. 3) adjust BV handle so it will open fully.