FIR16-00379
| INSP-Sprinkler Rough-in | 6/30/2016 | 6/30/2016 | 7/1/2016 5:59:41 AM | P | PASS |
|
|
Rough-in passed. Piping to be covered.
|
BLD16-00555
| FIRE-Final Inspection | 6/29/2016 | 6/30/2016 | 7/1/2016 5:59:01 AM | P | FAIL |
|
|
Provide panic hardware at the exterior exit doors per approved plans sheets A-2 and A-4, Repair the tow exit signs in the Banquet Room, Provide exit signs at the openings into the Corridor per approved plan sheet E-2, Provide revised plans to plan review showing door/wall separating Hallway1 from Hallway 3, new Room at Walk-in Freezer and walll delete at Womens Restroom and Hallway 1, Post revised Occupant Load Sign for 309
|
BLD16-02347
| FIRE-Final Inspection | 6/29/2016 | 6/30/2016 | 6/30/2016 11:11:28 AM | A | FAIL |
|
|
See the city approved plans for corrections needed which includes hardware and exit signs and fire extinguishers.
|
BLD15-01869
| FIRE-Conference | 6/30/2016 | 6/30/2016 | 6/30/2016 11:01:53 AM | A | DONE |
|
|
Pressure this morning was 69psi
|
FIR15-00822
| INSP-Conference | 6/30/2016 | 6/30/2016 | 6/30/2016 10:35:25 AM | A | DONE |
|
|
Pressure this morning was 69psi
|