PLM96-01515
| INSP - Plumbing Rough-in | 6/3/1996 | 6/4/1996 | 6/4/1996 12:00:00 AM | A | PASS |
|
|
06/03/96 330 - BASIC 9 FIXTURES.
|
PLM96-01517
| INSP - Sprinkler & Backflow | 6/3/1996 | 6/4/1996 | 6/4/1996 12:00:00 AM | A | PASS |
|
|
06/03/96 330 -
|
PLM96-01522
| INSP - Plumbing Rough-in | 6/4/1996 | 6/4/1996 | 6/4/1996 12:00:00 AM | P | PASS |
|
|
06/04/96 330 - BASIC 9 FIXTURES
|
PLM96-00035
| INSP - Final | 6/4/1996 | 6/4/1996 | 6/4/1996 12:00:00 AM | P | PASS |
|
|
06/04/96 330 -
|
PLM96-00848
| INSP - Sewer line | 6/4/1996 | 6/4/1996 | 6/4/1996 12:00:00 AM | P | PART |
|
|
06/04/96 330 - partial pressure sewer ok phase 2 air test ok from chuck use2" wyes in place of 11/2 co wyes
|