BLD01-00455
| BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | | FAIL |
|
|
no call for insp 6/4/2001 9:50:33 AM
|
BLD00-03361
| BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | | PASS |
|
|
wip...recvg spec insp reports,deck & col's being placed 6/4/2001 9:55:54 AM
|
BLD01-00493
| BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | | FAIL |
|
|
no call... 6/4/2001 9:56:51 AM
|
BLD01-00487
| BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | | FAIL |
|
|
no call? 6/4/2001 10:00:53 AM
|
BLD01-00448
| BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | | PASS |
|
|
demo only 6/4/2001 9:57:46 AM
|
BLD01-00828
| BLD-Conference | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 6/4/2001 9:22:24 AM w/ Pat re c/n...need air seal at boots & other air leak points per BEC.
|
BLD00-02143
| BLD-Concrete | 6/1/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 12:08:39. Contact: ###-####...still need p&z for final 6/4/2001 3:28:21 PM
|
MIS01-00100
| BLD-Final | 6/1/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | A | NR |
|
|
inspection for moving house Nicole Brown ###-#### or ###-####...called twice, left msg. 6/4/2001 5:14:48 PM
|
BLD99-03148
| BLD-Framing/Rough-in | 6/1/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | A | FAIL |
|
|
cover on the third floor ###-#### Brett; need complete firestopping above ceiling lines, remove face paper & fill cavities w/ insul or sprinkler. show header sizes 6/4/2001 5:10:35 PM
|
BLD01-00626
| BLD-Framing/Rough-in | 6/1/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | P | FAIL |
|
|
6/1/2001 3:41:04 PM, complete air seal, 1hr wall, f.p. do not insul. 6/4/2001 6:33:54 PM
|
BLD00-03157
| BLD-Framing/Rough-in | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | P | PART |
|
|
april ###-#### reinspection; ok to insul...address a/c units at shear walls 6/4/2001 6:02:19 PM
|
BLD00-03659
| BLD-Conference | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 6/4/2001 12:17:19 PM keep c/n; w/ refrig system installer re labelling & diagrams, etc
|
BLD00-03361
| BLD-Concrete | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 6/4/2001 3:24:54 PM part, pend spec insp.
|
BLD00-02242
| BLD-Framing/Rough-in | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | P | PART |
|
|
###-####; ok to cover floor at east...seal floor drains 1st. ok to frame "shafts" for hvac 6/4/2001 3:19:34 PM
|